|
Matronics Email Lists Web Forum Interface to the Matronics Email Lists
|
View previous topic :: View next topic |
Author |
Message |
cehoffman(at)bellsouth.ne Guest
|
Posted: Tue Jun 26, 2007 8:04 am Post subject: Dynon Deliveries |
|
|
If anyone has any influence with Dynon, I need help.
Dynon has now slipped the delivery of my D-10 EMS to 15 July for the instrument and September for the wiring and probe kit (O-540). My original order date was 1 March, through Spruce, with a 21 May delivery date!!
That is 105 days for the instrument and 150 days plus for the wiring/probes.
I cannot install my engine until I have the wiring runs complete and may have to look at an alternative..
Cal Hoffman (40119)
Change the world one loan at a time - visit Kiva.org to find out how
[quote][b]
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|
Back to top |
|
|
jesse(at)saintaviation.co Guest
|
Posted: Tue Jun 26, 2007 8:58 am Post subject: Dynon Deliveries |
|
|
You should be able to install your engine before doing the wiring. It is a little easier to get the wiring in first, but you don’t have to.
Do not archive
Jesse Saint
Saint Aviation, Inc.
jesse(at)saintaviation.com (jesse(at)saintaviation.com)
www.saintaviation.com
Cell: 352-427-0285
Fax: 815-377-3694
From: owner-rv10-list-server(at)matronics.com [mailto:owner-rv10-list-server(at)matronics.com] On Behalf Of Cal Hoffman
Sent: Tuesday, June 26, 2007 12:06 PM
To: RV 10 List
Subject: Dynon Deliveries
If anyone has any influence with Dynon, I need help.
Dynon has now slipped the delivery of my D-10 EMS to 15 July for the instrument and September for the wiring and probe kit (O-540). My original order date was 1 March, through Spruce, with a 21 May delivery date!!
That is 105 days for the instrument and 150 days plus for the wiring/probes.
I cannot install my engine until I have the wiring runs complete and may have to look at an alternative..
Cal Hoffman (40119)
Change the world one loan at a time - visit Kiva.org to find out how
[quote] [b]
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|
Back to top |
|
|
millstees(at)ameritech.ne Guest
|
Posted: Tue Jun 26, 2007 11:19 am Post subject: Dynon Deliveries |
|
|
Cal:
I ordered dual GRT EFIS this past spring. I was quoted 8 weeks, and it arrived in 9, all in one box...complete. I am still in the process of installing, so I can't address the quality of the unit, however, the customer service was more than I expected.
Steve Mills N750SM (reserved)
RV-10 40486 Slow-build
Naperville, Illinois
Finishing kit Eggenfellner E6-T
Do Not Archive
[quote] --
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|
Back to top |
|
|
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
|
Powered by phpBB © 2001, 2005 phpBB Group
|