Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Building Sequence - how long can I delay riveting the fibe

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List
View previous topic :: View next topic  
Author Message
MauleDriver(at)nc.rr.com
Guest





PostPosted: Sat May 03, 2008 3:48 am    Post subject: Building Sequence - how long can I delay riveting the fibe Reply with quote

That's what I was hoping to hear. I really wanted to keep going with
the composite work - doors, cowl - since all my tools are dulled and
dust is everywhere despite aggressive vacuuming.

I'm assuming that the top parts all need to be cleco'd together in order
to hang the engine for a little structural integrity?

Bill

Rick Sked wrote:
[quote]

Bill,

I fitted my cabin top and doors way back. Since then I have, put it on the gear, hung the engine & prop, installed all the wiring, the panel, finished the cowl/FWF/baffeling. Basically my -10 is complete without the top on. The top/windows and the pants/faring are all that's left to do shy of hanging the wings and final assembly..(yeah right) I found it so much easier to climb in and out without the cabin top on the fuselage. I'm afraid as soon as the top is on I'll see that bright light at the end of the tunnel and really start to think I'm done.

Rick Sked
40185
---


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
speckter(at)comcast.net
Guest





PostPosted: Sat May 03, 2008 5:31 am    Post subject: Building Sequence - how long can I delay riveting the fibe Reply with quote

No, I was able to put the engine on without the top on and all fit later.

Gary

--


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group