Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Sec 29 follow-up question

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List
View previous topic :: View next topic  
Author Message
rv10(at)sinkrate.com
Guest





PostPosted: Fri Jul 04, 2008 7:05 pm    Post subject: Sec 29 follow-up question Reply with quote

Back in Sec 29-17 & 18 (links below for reference)

http://www.myrv10.com/Plans/RV10_Plans_sec29-pg17.html
http://www.myrv10.com/Plans/RV10_Plans_sec29-pg18.html

When riveting the fuse side skins to the understructure the plans state in bold several times to “Only rivet the locations that have rivet callouts”. Were “excited” to start the process of attaching the cabin top this weekend and I keep coming back to this Sec 29 about riveting the F-1015C Mid Cabin Decks. From the Figures you can clearly see that there are no rivet callouts for every 3rd rivet that goes through the side skins into the Mid Cabin Decks so being astute Van’s plans followers we skipped those rivet locations. Fast forward to Section 43 – Cabin Top and I’m still wondering when were suppose to rivet these? I’ve skimmed the plans several times and have not seen…

<![if !supportLists]>1) <![endif]>The reason for skipping those rivets in Sec 29?
<![if !supportLists]>2) <![endif]>The place further in the plans where we are supposed to complete those sections?

Can anyone enlighten me as to what/where I am missing out on this please? I really doubt it’s a “weight saving” feature.

-Ben Westfall

Happy 4th of July.
[quote][b]


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
toaster73(at)embarqmail.c
Guest





PostPosted: Fri Jul 04, 2008 7:20 pm    Post subject: Sec 29 follow-up question Reply with quote

The holes are used to locate the doors and drill holes in the doors to join the inner and outer doors together. I suppose they are riveted after the doors are fitted, can't recall exactly.
Chris
#40072
[quote] ---


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
egohr1



Joined: 17 Jan 2006
Posts: 38
Location: Oklahoma City

PostPosted: Sat Jul 05, 2008 4:42 am    Post subject: Re: Sec 29 follow-up question Reply with quote

These holes are used to clamp the door halves together while they cure.
I never found a spot in the plans were it said to rivet them, but I filled the holes after the doors where completed.

Eric Gohr
In the maze of wires.


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List

_________________
eric gohr
EGOHR86@alumni.carnegiemellon.edu
Back to top
View user's profile Send private message
rv10(at)sinkrate.com
Guest





PostPosted: Sat Jul 05, 2008 8:33 am    Post subject: Sec 29 follow-up question Reply with quote

Thanks guys, makes sense.

--


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group