|
Matronics Email Lists Web Forum Interface to the Matronics Email Lists
|
View previous topic :: View next topic |
Author |
Message |
rv10(at)sinkrate.com Guest
|
Posted: Fri Jul 04, 2008 7:05 pm Post subject: Sec 29 follow-up question |
|
|
Back in Sec 29-17 & 18 (links below for reference)
http://www.myrv10.com/Plans/RV10_Plans_sec29-pg17.html
http://www.myrv10.com/Plans/RV10_Plans_sec29-pg18.html
When riveting the fuse side skins to the understructure the plans state in bold several times to “Only rivet the locations that have rivet callouts”. Were “excited” to start the process of attaching the cabin top this weekend and I keep coming back to this Sec 29 about riveting the F-1015C Mid Cabin Decks. From the Figures you can clearly see that there are no rivet callouts for every 3rd rivet that goes through the side skins into the Mid Cabin Decks so being astute Van’s plans followers we skipped those rivet locations. Fast forward to Section 43 – Cabin Top and I’m still wondering when were suppose to rivet these? I’ve skimmed the plans several times and have not seen…
<![if !supportLists]>1) <![endif]>The reason for skipping those rivets in Sec 29?
<![if !supportLists]>2) <![endif]>The place further in the plans where we are supposed to complete those sections?
Can anyone enlighten me as to what/where I am missing out on this please? I really doubt it’s a “weight saving” feature.
-Ben Westfall
Happy 4th of July.
[quote][b]
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|
Back to top |
|
|
toaster73(at)embarqmail.c Guest
|
Posted: Fri Jul 04, 2008 7:20 pm Post subject: Sec 29 follow-up question |
|
|
The holes are used to locate the doors and drill holes in the doors to join the inner and outer doors together. I suppose they are riveted after the doors are fitted, can't recall exactly.
Chris
#40072
[quote] ---
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|
Back to top |
|
|
egohr1
Joined: 17 Jan 2006 Posts: 38 Location: Oklahoma City
|
Posted: Sat Jul 05, 2008 4:42 am Post subject: Re: Sec 29 follow-up question |
|
|
These holes are used to clamp the door halves together while they cure.
I never found a spot in the plans were it said to rivet them, but I filled the holes after the doors where completed.
Eric Gohr
In the maze of wires.
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
_________________ eric gohr
EGOHR86@alumni.carnegiemellon.edu |
|
Back to top |
|
|
rv10(at)sinkrate.com Guest
|
Posted: Sat Jul 05, 2008 8:33 am Post subject: Sec 29 follow-up question |
|
|
Thanks guys, makes sense.
--
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|
Back to top |
|
|
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
|
Powered by phpBB © 2001, 2005 phpBB Group
|