Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Checllist Procedure for Z-13/8 Power Distribution

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> AeroElectric-List
View previous topic :: View next topic  
Author Message
nuckolls.bob(at)aeroelect
Guest





PostPosted: Wed Feb 04, 2009 8:15 pm    Post subject: Checllist Procedure for Z-13/8 Power Distribution Reply with quote

At 05:26 PM 2/4/2009, you wrote:
Quote:
Bob,
The Dynon log is set up to samples data every 10 seconds, so the
short period of time is less than 20 seconds. I agree that the
amperage values may be a signal conditioning problem, but I still
believe that main alternator is seeing a substantial transient
during this test. Can this damage the alternator?

No, it wont.
Bob . . .

----------------------------------------)
( . . . a long habit of not thinking )
( a thing wrong, gives it a superficial )
( appearance of being right . . . )
( )
( -Thomas Paine 1776- )
----------------------------------------


- The Matronics AeroElectric-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?AeroElectric-List
Back to top
nuckolls.bob(at)aeroelect
Guest





PostPosted: Wed Feb 04, 2009 8:16 pm    Post subject: Checllist Procedure for Z-13/8 Power Distribution Reply with quote

At 05:26 PM 2/4/2009, you wrote:
Quote:
Bob,

The Dynon log is set up to samples data every 10 seconds, so the
short period of time is less than 20 seconds. I agree that the
amperage values may be a signal conditioning problem, but I still
believe that main alternator is seeing a
substantial transient during this test. Can this damage the alternator?
Which alternator/regulator combination are you running?


Bob . . .


- The Matronics AeroElectric-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?AeroElectric-List
Back to top
Norm Biron



Joined: 04 Feb 2009
Posts: 7

PostPosted: Wed Feb 04, 2009 8:36 pm    Post subject: Checllist Procedure for Z-13/8 Power Distribution Reply with quote

<?xml:namespace prefix="v" /><?xml:namespace prefix="o" /><![endif]--> Bob,

I HAVE THE B & C L-60 ALTERNATOR WITH THE LR-3 CONTROLLER.

Norm
[quote] ---


- The Matronics AeroElectric-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?AeroElectric-List
Back to top
View user's profile Send private message
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> AeroElectric-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group