Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Current Status Of Mr. RV-8...

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV8-List
View previous topic :: View next topic  
Author Message
Matt Dralle
Site Admin


Joined: 08 Nov 2005
Posts: 25704
Location: Livermore CA USA

PostPosted: Thu Jan 21, 2010 9:46 pm    Post subject: Current Status Of Mr. RV-8... Reply with quote

Hey RV'ers,

I've been a little quiet lately on the List because I've been working so hard on the RV-8! I'm happy to report that the Engine, Interior, Wiring, Avionics, and canopy are all complete. Basically all I've got left is some fiberglass around the windscreen, and a few other odds and ends and its time to move it out to the hanger for final assembly! I thought I'd share a few current pictures just for fun.

Test flight in March...?

Matt Dralle
RV-8 #82880 N998RV
http://www.mattsrv8.com Tons Of Construction Photos
Final Assembly...


- The Matronics RV8-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV8-List



2010.01.20_-_RV-8_-_Sliding_Canopy_Installation_Complete_(10).jpg
 Description:
 Filesize:  147.35 KB
 Viewed:  1289 Time(s)

2010.01.20_-_RV-8_-_Sliding_Canopy_Installation_Complete_(10).jpg



2010.01.20_-_RV-8_-_Sliding_Canopy_Installation_Complete_(9).jpg
 Description:
 Filesize:  151.48 KB
 Viewed:  1289 Time(s)

2010.01.20_-_RV-8_-_Sliding_Canopy_Installation_Complete_(9).jpg



2010.01.20_-_RV-8_-_Sliding_Canopy_Installation_Complete_(8).jpg
 Description:
 Filesize:  158.81 KB
 Viewed:  1289 Time(s)

2010.01.20_-_RV-8_-_Sliding_Canopy_Installation_Complete_(8).jpg



2010.01.20_-_RV-8_-_Sliding_Canopy_Installation_Complete_(7).jpg
 Description:
 Filesize:  155.01 KB
 Viewed:  1289 Time(s)

2010.01.20_-_RV-8_-_Sliding_Canopy_Installation_Complete_(7).jpg



2010.01.20_-_RV-8_-_Sliding_Canopy_Installation_Complete_(4).jpg
 Description:
 Filesize:  139.37 KB
 Viewed:  1289 Time(s)

2010.01.20_-_RV-8_-_Sliding_Canopy_Installation_Complete_(4).jpg



2010.01.14_-_RV-8_-_Final_Instrument_Panel_Installation_(1).jpg
 Description:
 Filesize:  92.23 KB
 Viewed:  1289 Time(s)

2010.01.14_-_RV-8_-_Final_Instrument_Panel_Installation_(1).jpg



2010.01.14_-_RV-8_-_Final_Instrument_Panel_Installation_(2).jpg
 Description:
 Filesize:  83.19 KB
 Viewed:  1289 Time(s)

2010.01.14_-_RV-8_-_Final_Instrument_Panel_Installation_(2).jpg



2010.01.14_-_RV-8_-_Final_Instrument_Panel_Installation_(3).jpg
 Description:
 Filesize:  86.2 KB
 Viewed:  1289 Time(s)

2010.01.14_-_RV-8_-_Final_Instrument_Panel_Installation_(3).jpg



2010.01.14_-_RV-8_-_Final_Instrument_Panel_Installation_(6).jpg
 Description:
 Filesize:  124.39 KB
 Viewed:  1289 Time(s)

2010.01.14_-_RV-8_-_Final_Instrument_Panel_Installation_(6).jpg



2010.01.14_-_RV-8_-_Final_Instrument_Panel_Installation_(9).jpg
 Description:
 Filesize:  118.11 KB
 Viewed:  1289 Time(s)

2010.01.14_-_RV-8_-_Final_Instrument_Panel_Installation_(9).jpg



2010.01.07_-_RV-8_-_Front_Baggage_Area_Complete_(1).jpg
 Description:
 Filesize:  163.6 KB
 Viewed:  1289 Time(s)

2010.01.07_-_RV-8_-_Front_Baggage_Area_Complete_(1).jpg



2010.01.07_-_RV-8_-_Front_Baggage_Area_Complete_(3).jpg
 Description:
 Filesize:  128.88 KB
 Viewed:  1289 Time(s)

2010.01.07_-_RV-8_-_Front_Baggage_Area_Complete_(3).jpg



2010.01.19_-_RV-8_-_Canopy_Frame_Side_Panel_Labeling_&_Installation_Complete_(7).jpg
 Description:
 Filesize:  104.39 KB
 Viewed:  1289 Time(s)

2010.01.19_-_RV-8_-_Canopy_Frame_Side_Panel_Labeling_&_Installation_Complete_(7).jpg



2010.01.01_-_RV-8_-_Cockpit_Control_Labeling_(2).jpg
 Description:
 Filesize:  97.94 KB
 Viewed:  1289 Time(s)

2010.01.01_-_RV-8_-_Cockpit_Control_Labeling_(2).jpg



2010.01.01_-_Front_&_Rear_Throttle_Quadrant_Installation_Complete_(1).jpg
 Description:
 Filesize:  109.83 KB
 Viewed:  1289 Time(s)

2010.01.01_-_Front_&_Rear_Throttle_Quadrant_Installation_Complete_(1).jpg



2010.01.01_-_Front_&_Rear_Throttle_Quadrant_Installation_Complete_(2).jpg
 Description:
 Filesize:  99.24 KB
 Viewed:  1289 Time(s)

2010.01.01_-_Front_&_Rear_Throttle_Quadrant_Installation_Complete_(2).jpg



2010.01.01_-_Front_&_Rear_Throttle_Quadrant_Installation_Complete_(3).jpg
 Description:
 Filesize:  109.81 KB
 Viewed:  1289 Time(s)

2010.01.01_-_Front_&_Rear_Throttle_Quadrant_Installation_Complete_(3).jpg



2010.01.20_-_RV-8_-_Sliding_Canopy_Installation_Complete_(5).jpg
 Description:
 Filesize:  177.39 KB
 Viewed:  1289 Time(s)

2010.01.20_-_RV-8_-_Sliding_Canopy_Installation_Complete_(5).jpg



2010.01.19_-_RV-8_-_Canopy_Frame_Side_Panel_Labeling_&_Installation_Complete_(11).jpg
 Description:
 Filesize:  140.23 KB
 Viewed:  1289 Time(s)

2010.01.19_-_RV-8_-_Canopy_Frame_Side_Panel_Labeling_&_Installation_Complete_(11).jpg



2010.01.19_-_RV-8_-_Canopy_Frame_Side_Panel_Labeling_&_Installation_Complete_(10).jpg
 Description:
 Filesize:  131.54 KB
 Viewed:  1289 Time(s)

2010.01.19_-_RV-8_-_Canopy_Frame_Side_Panel_Labeling_&_Installation_Complete_(10).jpg



_________________
Matt Dralle
Matronics Email List Administrator
Back to top
View user's profile Send private message Send e-mail Visit poster's website
Matt Dralle
Site Admin


Joined: 08 Nov 2005
Posts: 25704
Location: Livermore CA USA

PostPosted: Fri Jan 22, 2010 10:56 pm    Post subject: Current Status Of Mr. RV-8... Reply with quote

Well, you'll get there!! I've put about 2200 hours in on the RV-8 project in about the last 18 months... I started it about mid-June of 08. Its a QB.

I've been dreaming about flying my own RV for 21 years now since I first started the RV-4 project way back in 1988!! I was one of the youngest people to be building an RV back then. Now, not so much... Wink

That first flight will definitely be a very special occasion...

Matt Dralle
RV-8 #82880 N998RV
http://www.mattsrv8.com Tons Of Construction Photos
Final Assembly...

At 12:16 PM 1/22/2010 Friday, you wrote:
Quote:


Matt,

I'm VERY impressed with all the interior installations. Great job!

Now I realize more than ever just how much work I have ahead of me. Thanks for the inspiration.

At 09:45 PM 1/21/2010, you wrote:

>Hey RV'ers,
>
>I've been a little quiet lately on the List because I've been working so hard on the RV-8! I'm happy to report that the Engine, Interior, Wiring, Avionics, and canopy are all complete. Basically all I've got left is some fiberglass around the windscreen, and a few other odds and ends and its time to move it out to the hanger for final assembly! I thought I'd share a few current pictures just for fun.
>
>Test flight in March...?
>
>Matt Dralle
>RV-8 #82880 N998RV
>http://www.mattsrv8.com Tons Of Construction Photos
>Final Assembly...


- The Matronics RV8-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV8-List

_________________
Matt Dralle
Matronics Email List Administrator
Back to top
View user's profile Send private message Send e-mail Visit poster's website
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV8-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group