|
Matronics Email Lists Web Forum Interface to the Matronics Email Lists
|
View previous topic :: View next topic |
Author |
Message |
Lee Steensland
Joined: 10 Apr 2008 Posts: 18 Location: Spokane-ish- WA
|
Posted: Sat Jun 19, 2010 8:20 pm Post subject: more upgrade questions |
|
|
Folks,
I feel like I'm a little thick sometimes. I have the center spar mostly assembled and I have both the front and back in position for drilling up through the top doubler (6-zu-2-1) However if I look closely through the holes I will just clip the old hole in 6w4-1.
I appear to be making an aluminum sandwich with the new top doubler 6-zu2-1 and the seat front angle 6-zu-2-2.
Should I just drill through the seat front angle, and into the top doubler, elongating the hole and not worry about it. I suppose that is why they went to pitch 20 on that row of rivets.
| - The Matronics Zenith601-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Zenith601-List |
|
Description: |
|
Filesize: |
33.89 KB |
Viewed: |
4719 Time(s) |
|
|
|
Back to top |
|
|
Lee Steensland
Joined: 10 Apr 2008 Posts: 18 Location: Spokane-ish- WA
|
Posted: Mon Jun 21, 2010 9:01 am Post subject: Re: more upgrade questions |
|
|
perhaps a little more data is in order:
I've attached a picture from from the latest set of upgrade drawings dated 25 Jan 2010. I've highlighted the rivets in question.
| - The Matronics Zenith601-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Zenith601-List |
|
Description: |
|
Filesize: |
19.37 KB |
Viewed: |
4673 Time(s) |
|
|
|
Back to top |
|
|
carlossa52(at)gmail.com Guest
|
|
Back to top |
|
|
mhubel
Joined: 05 Sep 2009 Posts: 141
|
Posted: Mon Jun 21, 2010 10:17 am Post subject: more upgrade questions |
|
|
Lee,
The drawing calls for rivets on a 20 mm pitch so some new holes need to be made anyway. I did all new holes with the old holes half way way between the new ones and offset enough so as to provide sufficient hole to hole spacing. If the old holes in yours are positioned such that there is no room to provide sufficient spacing, then ZAC will have to come up with something.
On 06/21/2010 1:34 PM, Carlos Sa wrote: [quote]I would suggest a call to ZAC is in order...
Carlos
On 21 June 2010 13:01, Lee Steensland <lee(at)steensland.net (lee(at)steensland.net)> wrote:
Quote: | --> Zenith601-List message posted by: "Lee Steensland" <lee(at)steensland.net (lee(at)steensland.net)>
perhaps a little more data is in order:
I've attached a picture from from the latest set of upgrade drawings dated 25 Jan 2010. I've highlighted the rivets in question.
Read this topic online here:
http://forums.matronics.com/viewtopic.php?p=301937#301937
Attachments:
http://forums.matronics.com//files/rivetsinquestion_246.jpg
href="http://www.matronics.com/Navigator?Zenith601-List">http://www.matronics.com/Navigator?Zenith601-List
href="http://forums.matronics.com">http://forums.matronics.com
href="http://www.matronics.com/contribution">http://www.matronics.com/contribution
| --
Mark Hubelbank
NorthEast Monitoring
2 Clock Tower Place
Suite 555
Maynard, MA, 01754 - USA
mhubel(at)nemon.com (mhubel(at)nemon.com)
978-443-3955[b]
| - The Matronics Zenith601-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Zenith601-List |
|
_________________ Mark Hubelbank
N708HU
CH601XL
Jabiru 3300
Rotec TBI 40-3 carb
Sensenich ground adj prop.
240 hr TAF
Pictures at photo.hubbles.com |
|
Back to top |
|
|
Lee Steensland
Joined: 10 Apr 2008 Posts: 18 Location: Spokane-ish- WA
|
Posted: Mon Jun 21, 2010 2:01 pm Post subject: Re: more upgrade questions |
|
|
From Caleb:
Quote: |
Hi Lee,
A doubler, such as this, is the proper way to repair ovalled holes. That is one of the reasons for having the part installed at all. When you mess up a hole and its ovalled, you put a doubler over the hole and rivet it to the web as well as the flange. This will unload the ovalled hole and provide an alternate load path (the load now goes through the doubler) into the web. In this case the doubler is heavier than the flange material because we want to add strength beyond the normal spar. The ovalled holes are a consequence of spacing the front and rear halves further apart 1/8" but this has been accounted for in the development of the upgrade package. You don't need to worry about ovalling those holes, just so long as the holes in the doublers are all round.
|
| - The Matronics Zenith601-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Zenith601-List |
|
|
|
Back to top |
|
|
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
|
Powered by phpBB © 2001, 2005 phpBB Group
|