|
Matronics Email Lists Web Forum Interface to the Matronics Email Lists
|
View previous topic :: View next topic |
Author |
Message |
cs(at)charlesstringham.co Guest
|
Posted: Sun Aug 29, 2010 7:00 pm Post subject: RV-8 QB Kit |
|
|
Hey Guys,
Great news. The RV-8 QB fuselage and wings arrived. So here's the question. The construction manual lists all of the individual steps, and the order in which they need to be completed. But that is for the standard build, not the quick build kit. Is there a published list of the steps that have already been completed in the QB kit, or do I need to go through the construction manual and figure out exactly which steps have already been done for me by the factory? I would hate to just start crossing construction steps off and then find out that some step that I thought had been done has, in fact not been done yet. Any thoughts?
Thanks, Chet
| - The Matronics RV8-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV8-List |
|
|
|
Back to top |
|
|
Michael Wynn
Joined: 10 Jan 2006 Posts: 148 Location: San Ramon, CA
|
Posted: Sun Aug 29, 2010 7:35 pm Post subject: RV-8 QB Kit |
|
|
Congratulations, Chet.
If I remember correctly, there is a spot in the construction manual that says: Quick Builders start here. It would probably be a good exercise to go through all the steps in manual, look at how they were done and sort of re-inspect the build. I think that would give you a better working knowledge of the structure. It would then be obvious where they left off.
You are in for a really fun adventure.
Regards,
Michael Wynn
RV 8 Finishing
San Ramon, CA
Do Not Archive
In a message dated 8/29/2010 8:01:23 P.M. Pacific Daylight Time, cs(at)charlesstringham.com writes:
Quote: | --> RV8-List message posted by: "cs(at)charlesstringham.com" <cs(at)charlesstringham.com>
Hey Guys,
Great news. The RV-8 QB fuselage and wings arrived. So here's the question. The construction manual lists all of the individual steps, and the order in which they need to be completed. But that is for the standard build, not the quick build kit. Is there a published list of the steps that have already been completed in the QB kit, or do I need to go through the construction manual and figure out exactly which steps have already been done for me by the factory? I would hate to just start crossing construction steps off and then find out that some step that I thought had been done has, in fact not been done yet. Any thoughts?
Thanks, ========================e ties Day ================================================ - MATRONICS WEB FORUMS ================================================ - List Contribution Web Site sp; ===================================================
|
[quote][b]
| - The Matronics RV8-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV8-List |
|
_________________ Michael Wynn
RV 8
San Ramon, CA |
|
Back to top |
|
|
cs(at)charlesstringham.co Guest
|
Posted: Sun Aug 29, 2010 8:27 pm Post subject: RV-8 QB Kit |
|
|
Thanks Michael.
--
| - The Matronics RV8-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV8-List |
|
|
|
Back to top |
|
|
rv8builder
Joined: 02 Jan 2009 Posts: 56
|
Posted: Mon Aug 30, 2010 3:25 am Post subject: RV-8 QB Kit |
|
|
In my circa 2001 8QB kit/manual, one had to go through the manual,
page by page, and check off what had or had not been done. And be
creative in some areas!
Dale
On Sun, Aug 29, 2010 at 10:59 PM, cs(at)charlesstringham.com
<cs(at)charlesstringham.com> wrote:
Quote: |
Hey Guys,
Great news. The RV-8 QB fuselage and wings arrived. So here's the question. The construction manual lists all of the individual steps, and the order in which they need to be completed. But that is for the standard build, not the quick build kit. Is there a published list of the steps that have already been completed in the QB kit, or do I need to go through the construction manual and figure out exactly which steps have already been done for me by the factory? I would hate to just start crossing construction steps off and then find out that some step that I thought had been done has, in fact not been done yet. Any thoughts?
Thanks, Chet
|
| - The Matronics RV8-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV8-List |
|
_________________ Dale |
|
Back to top |
|
|
tracy(at)rotaryaviation.c Guest
|
Posted: Mon Aug 30, 2010 4:14 am Post subject: RV-8 QB Kit |
|
|
Yep, that was my major complaint with the -8 QB kit. "Special" QB instructions for the Fuse read "Start at the aft end and work forward" Spent a lot of time combing through the standard plans.
Tracy Crook
On Sun, Aug 29, 2010 at 10:59 PM, cs(at)charlesstringham.com (cs(at)charlesstringham.com) <cs(at)charlesstringham.com (cs(at)charlesstringham.com)> wrote:
Quote: | --> RV8-List message posted by: "cs(at)charlesstringham.com (cs(at)charlesstringham.com)" <cs(at)charlesstringham.com (cs(at)charlesstringham.com)>
Hey Guys,
Great news. The RV-8 QB fuselage and wings arrived. So here's the question. The construction manual lists all of the individual steps, and the order in which they need to be completed. But that is for the standard build, not the quick build kit. Is there a published list of the steps that have already been completed in the QB kit, or do I need to go through the construction manual and figure out exactly which steps have already been done for me by the factory? I would hate to just start crossing construction steps off and then find out that some step that I thought had been done has, in fact not been done yet. Any thoughts?
Thanks, Chet
===========
rget="_blank">http://www.matronics.com/Navigator?RV8-List
===========
http://forums.matronics.com
===========
le, List Admin.
="_blank">http://www.matronics.com/contribution
===========
|
#avg_ls_inline_popup { position:absolute; z-index:9999; padding: 0px 0px; margin-left: 0px; margin-top: 0px; width: 240px; overflow: hidden; word-wrap: break-word; color: black; font-size: 10px; text-align: left; line-height: 13px;} [quote][b]
| - The Matronics RV8-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV8-List |
|
|
|
Back to top |
|
|
Paul Valovich
Joined: 11 Jan 2006 Posts: 75
|
Posted: Mon Aug 30, 2010 5:42 am Post subject: RV-8 QB Kit |
|
|
My 2004 -8A QB instructions contained statement somewhere up front that no instructions changes were made to accommodate quick builders (QB - an oxymoron in my case – 3 year project going on for 6 years). I initially thought that was a Vans cop-out, but having to carefully peruse the plans and then determine what was already factory-done provided a pretty detailed understanding of the big picture process.
Don’t get hung up on the order of construction tasks – especially after to get the emp, ailerons, flaps, and wings fitted. I’ve also found that with the firewall forward and finishing kits, the instructions are advisory only; have to figure out design and fit stuff on your own.
[quote][b]
| - The Matronics RV8-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV8-List |
|
|
|
Back to top |
|
|
cs(at)charlesstringham.co Guest
|
Posted: Mon Aug 30, 2010 7:00 am Post subject: RV-8 QB Kit |
|
|
Thanks everyone for your advice. Indeed there is a note in the fuselage section about starting at page 42 for QB. But I think I will go through items one by one to gain a better understanding. Chet
Sent from my Verizon Wireless BlackBerry
--
| - The Matronics RV8-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV8-List |
|
|
|
Back to top |
|
|
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
|
Powered by phpBB © 2001, 2005 phpBB Group
|