Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Lightening up Z12

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> AeroElectric-List
View previous topic :: View next topic  
Author Message
rvg8tor



Joined: 06 Apr 2009
Posts: 50
Location: Olympia, WA

PostPosted: Wed Apr 20, 2011 11:59 am    Post subject: Lightening up Z12 Reply with quote

I am going to ask this question a different way. In Z12 there are 2 alternators, on plays a standby roll and will only produce power when the main alternator goes out or is turned off. Given that only one alternator operates at a time only one ammeter would be needed to monitor the electrical load coming from the alternator providing the power.

This reduces parts count; takes out a shunt and switch required to look at two shunts with on meter and or removes extra ammeter.

So does anyone see any flaws in this logic?

Cheers


- The Matronics AeroElectric-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?AeroElectric-List

_________________
Mike "Nemo" Elliott
RV-8A QB (Engine)
www.mykitlog.com/rvg8tor
Back to top
View user's profile Send private message Send e-mail Visit poster's website
nuckolls.bob(at)aeroelect
Guest





PostPosted: Wed Apr 20, 2011 4:57 pm    Post subject: Lightening up Z12 Reply with quote

At 03:59 PM 4/20/2011, you wrote:
Quote:


I am going to ask this question a different way. In Z12 there are 2
alternators, on plays a standby roll and will only produce power
when the main alternator goes out or is turned off. Given that only
one alternator operates at a time only one ammeter would be needed
to monitor the electrical load coming from the alternator providing
the power.

This reduces parts count; takes out a shunt and switch required to
look at two shunts with on meter and or removes extra ammeter.

So does anyone see any flaws in this logic?

That will work

Bob . . .


- The Matronics AeroElectric-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?AeroElectric-List
Back to top
rvg8tor



Joined: 06 Apr 2009
Posts: 50
Location: Olympia, WA

PostPosted: Fri Apr 22, 2011 10:50 am    Post subject: Re: Lightening up Z12 Reply with quote

Bob,

Since I would like to share one shunt, the shunt would have to come after the ANL for the main alternator and the fusible link for the standby alternator. Is there any issue with the placement of the shunt before or after the wire protection? Attached is a drawing of the proposal. The connection between the shunt and ANL will more than likely be copper bar stock.

You can see the standby B lead fusible link attaches to the shunt along with the B lead from the main alternator.

Also can you think of a failure mode in which the main alternator might be putting out a low amount of power that would still trip the 13V set point of the standby regulator? I am trying to think if there is a failure mode in which both alternators would be putting out power.

Thanks for the help.
nuckolls.bob(at)aeroelect wrote:
At 03:59 PM 4/20/2011, you wrote:
Quote:


I am going to ask this question a different way. In Z12 there are 2
alternators, on plays a standby roll and will only produce power
when the main alternator goes out or is turned off. Given that only
one alternator operates at a time only one ammeter would be needed
to monitor the electrical load coming from the alternator providing
the power.

This reduces parts count; takes out a shunt and switch required to
look at two shunts with on meter and or removes extra ammeter.

So does anyone see any flaws in this logic?


That will work

Bob . . .


- The Matronics AeroElectric-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?AeroElectric-List



Electrical System - Power Distribution Shared Shunt.pdf
 Description:
Z12 Modified

Download
 Filename:  Electrical System - Power Distribution Shared Shunt.pdf
 Filesize:  188.36 KB
 Downloaded:  366 Time(s)


_________________
Mike "Nemo" Elliott
RV-8A QB (Engine)
www.mykitlog.com/rvg8tor
Back to top
View user's profile Send private message Send e-mail Visit poster's website
nuckolls.bob(at)aeroelect
Guest





PostPosted: Fri Apr 22, 2011 1:02 pm    Post subject: Lightening up Z12 Reply with quote

At 02:50 PM 4/22/2011, you wrote:
Quote:


Bob,

Since I would like to share one shunt, the shunt would have to come
after the ANL for the main alternator and the fusible link for the
standby alternator. Is there any issue with the placement of the
shunt before or after the wire protection? Attached is a drawing of
the proposal.

You can see the fuseable link attaches to the shunt along wiht the B
lead from the main alternator

What you show is fine.
Bob . . .


- The Matronics AeroElectric-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?AeroElectric-List
Back to top
rvg8tor



Joined: 06 Apr 2009
Posts: 50
Location: Olympia, WA

PostPosted: Sat Apr 23, 2011 6:00 am    Post subject: Re: Lightening up Z12 Reply with quote

Thought I would follow up with a picture. I decided to attach the standby alternator B lead on the downstream side of the ANL since it was more substantial than the screw on the shunt. If the screws on the shunt were to work loose there is a tight enough fit that the copper bar should stay in place and provide some conductivity. In the drawing in the second post of this thread, the standby B lead was attached at the shunt.

Ring on terminal on the left is the standby B lead and the main is on the right of the ANL. Yellow fat wire goes through firewall to battery master relay (switched side), main bus feed is off the same side of the battery relay.

Cheers



- The Matronics AeroElectric-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?AeroElectric-List

_________________
Mike "Nemo" Elliott
RV-8A QB (Engine)
www.mykitlog.com/rvg8tor
Back to top
View user's profile Send private message Send e-mail Visit poster's website
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> AeroElectric-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group