lcottrell
Joined: 29 May 2006 Posts: 1494 Location: Jordan Valley, Or
|
Posted: Mon Apr 02, 2012 7:40 pm Post subject: Steel gear legs heat treating facility |
|
|
Inland Northwest Metallogical Services Inc. 16203 e. Marietta Ave Spokane Wa. [url=tel:800-379-2231]800-379-2231[/url] or [url=tel:509%20922-7663]509 922-7663[/url] [Dan] Cost was 75.00 They vertically dip to cool and did come out straight. But no guarantees. It is best to provide a hard cardboard cylinder for shipping. Turn around time was one week. Cost was $75. plus shipping. All holes must be pre-drilled.
Andy Slinkard in Washington is finishing his Firestar and contacted me about someone to heat treat the legs. The above is what he found. Some have sent them off to be heat treated and they have come back with a bend in them, which is almost impossible to get out. These guy's apparently hang them which does not put any stress on them. The hardness came out to 47-49 Rockwell.
Larry
--
If you forward this email, or any part of it, please remove my email address before sending.
[quote][b]
| - The Matronics Kolb-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Kolb-List |
|
_________________ do not archive |
|