Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Building the tail cone

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List
View previous topic :: View next topic  
Author Message
trigo(at)mail.telepac.pt
Guest





PostPosted: Thu May 17, 2012 9:45 am    Post subject: Building the tail cone Reply with quote

Question for those who used a quickbuild fuselage:

Did you build the tail cone structure using the quickbuild fuselage as a hanger (not to be mistaken with hangAr)?
In other words, did you hang the tail cone structure on the fuselage when building it, or did you build it separately?

Regards
Carlos
[quote][b]


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
philperry9



Joined: 23 Nov 2011
Posts: 381

PostPosted: Thu May 17, 2012 9:52 am    Post subject: Building the tail cone Reply with quote

On Thursday, May 17, 2012, Carlos Trigo wrote:
Quote:

Question for those who used a quickbuild fuselage:
It is done separately and attached after the fuselage is built.  




 
[quote]
 
  Did you build the tail cone structure using the quickbuild fuselage as a hanger (not to be mistaken with hangAr)?
In other words, did you hang the tail cone structure on the fuselage when building it, or did you build it separately?
 
Regards
Carlos
Quote:


get="_blank">http://www.matronics.com/Navigator?RV10-List
tp://forums.matronics.com
_blank">http://www.matronics.com/contribution


[b]


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
View user's profile Send private message
dmaib@me.com



Joined: 25 Apr 2006
Posts: 454
Location: New Smyrna Beach, Florida

PostPosted: Thu May 17, 2012 10:03 am    Post subject: Building the tail cone Reply with quote

It is built separately. The plans tell you when to attach the tail cone to the fuselage.

David Maib
40559
RV-10 Transition Trainer

On May 17, 2012, at 1:43 PM, Carlos Trigo wrote:
Question for those who used a quickbuild fuselage:

Did you build the tail cone structure using the quickbuild fuselage as a hanger (not to be mistaken with hangAr)?
In other words, did you hang the tail cone structure on the fuselage when building it, or did you build it separately?

Regards
Carlos

Quote:


style="color: blue; text-decoration: underline; ">http://www.matronics.com/Navigator?RV10-List
blue; text-decoration: underline; ">http://forums.matronics.com
style="color: blue; text-decoration: underline; ">http://www.matronics.com/contribution



- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List

_________________
David Maib
RV-10 #40559
New Smyrna Beach, FL
Back to top
View user's profile Send private message
Bob Turner



Joined: 03 Jan 2009
Posts: 885
Location: Castro Valley, CA

PostPosted: Thu May 17, 2012 12:54 pm    Post subject: Re: Building the tail cone Reply with quote

Due to a backlog of QB orders at Vans', my tailcone was completed before I ever had the QB fuselage.

- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List

_________________
Bob Turner
RV-10 QB
Back to top
View user's profile Send private message Send e-mail
Kelly McMullen



Joined: 16 Apr 2008
Posts: 1188
Location: Sun Lakes AZ

PostPosted: Thu May 17, 2012 6:27 pm    Post subject: Building the tail cone Reply with quote

About what I had...ordered when I figured I need the QB in 10 weeks. 8
months later I got my shipment, with some significant errors by the
"new" QB facility. Hopefully they have improved in the last 2 yrs.

On Thu, May 17, 2012 at 1:54 PM, Bob Turner <bobturner(at)alum.rpi.edu> wrote:
Quote:


Due to a backlog of QB orders at Vans', my tailcone was completed before I ever had the QB fuselage.

--------
Bob Turner
RV-10 QB


Read this topic online here:

http://forums.matronics.com/viewtopic.php?p=373247#373247




- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List

_________________
Kelly McMullen
A&P/IA, EAA Tech Counselor
KCHD
Back to top
View user's profile Send private message
civengpe



Joined: 14 Feb 2011
Posts: 105

PostPosted: Fri May 18, 2012 3:46 am    Post subject: Building the tail cone Reply with quote

If you are concerned about the quality of the QB, one option is Wally at Synergy Air. He did both my QB wings and fuse. The workmanship was second to none and it was the same price as Van's.

Shannon

On May 17, 2012, at 9:26 PM, Kelly McMullen <apilot2(at)gmail.com> wrote:

Quote:


About what I had...ordered when I figured I need the QB in 10 weeks. 8
months later I got my shipment, with some significant errors by the
"new" QB facility. Hopefully they have improved in the last 2 yrs.

On Thu, May 17, 2012 at 1:54 PM, Bob Turner <bobturner(at)alum.rpi.edu> wrote:
>
>
> Due to a backlog of QB orders at Vans', my tailcone was completed before I ever had the QB fuselage.
>
> --------
> Bob Turner
> RV-10 QB
>
>
>
>
> Read this topic online here:
>
> http://forums.matronics.com/viewtopic.php?p=373247#373247
>
>
>
>
>
>
>
>
>
>







- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
View user's profile Send private message
trigo(at)mail.telepac.pt
Guest





PostPosted: Fri May 18, 2012 4:16 am    Post subject: Building the tail cone Reply with quote

Well, thanks for the answers, but I do know that the plans tell you to build the tail cone separately from the middle and forward fuselage.

What I want to know is if anybody used, or recommends using the QB fuselage to hang the tail cone structure, while building the tail cone.

If not, where does everybody put the tail cone while building it? Just laid over your work bench, or did you make a kind of gig?

Carlos


[quote] --


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
EdKranz



Joined: 29 Dec 2010
Posts: 132
Location: Hastings, MN

PostPosted: Fri May 18, 2012 4:48 am    Post subject: Building the tail cone Reply with quote

I'm just finishing up my tail cone, and I think having it attached to the fuse would just make it almost impossible to get things installed. Once you put the longerons and top skin on, it's fully rigid and doesn't need a jig.

I built mine on a pair of 2x3's screwed to the top of my bench, overhanging about 2.5 feet. I think I got this idea from Tim Olsen. Worked awesome! This both supported everything well and kept a gap between the bench top and the skins so the clecos wouldn't have interference.


I am keeping video of my entire build, so you can see exactly how it goes together here (and in later videos as well):
http://www.edandcolleen.com/tail-cone-taking-shape/ 


I have been able to do all construction on the tail cone single handed up to the point I'm at now.

On Fri, May 18, 2012 at 7:14 AM, Carlos Trigo <trigo(at)mail.telepac.pt (trigo(at)mail.telepac.pt)> wrote:
[quote]
Well, thanks for the answers, but I do know that the plans tell you to build the tail cone separately from the middle and forward fuselage.
 
What I want to know is if anybody used, or recommends using the QB fuselage to hang the tail cone structure, while building the tail cone.
 
If not, where does everybody put the tail cone while building it? Just laid over your work bench, or did you make a kind of gig?
 
Carlos
 

[b]


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List

_________________
Ed Kranz
RV10
Finishing
www.edandcolleen.com
Back to top
View user's profile Send private message Visit poster's website
carl.froehlich(at)verizon
Guest





PostPosted: Fri May 18, 2012 5:18 am    Post subject: Building the tail cone Reply with quote

It sits on a work bench. Amazingly the CNC pre-punch system is so good that if you follow the instructions the tail cone mates perfectly with the fuselage.

From: owner-rv10-list-server(at)matronics.com [mailto:owner-rv10-list-server(at)matronics.com] On Behalf Of Carlos Trigo
Sent: Friday, May 18, 2012 8:15 AM
To: rv10-list(at)matronics.com
Subject: RE: Re: Building the tail cone

Well, thanks for the answers, but I do know that the plans tell you to build the tail cone separately from the middle and forward fuselage.

What I want to know is if anybody used, or recommends using the QB fuselage to hang the tail cone structure, while building the tail cone.

If not, where does everybody put the tail cone while building it? Just laid over your work bench, or did you make a kind of gig?

Carlos


[quote] --


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
mauledriver(at)nc.rr.com
Guest





PostPosted: Fri May 18, 2012 5:21 am    Post subject: Building the tail cone Reply with quote

Hanging it would only make it more difficult. You'll want to build the tailcne on a flat bench.  No jig.
What worked well for me was large back riveting plate. Mine was about 24" x 12" x 1/4" (guesstimate) from a local scap yard. This was laid on the bench and scrap 1/4" ply from the crate was used to fit around the plate to provide a folate surface for the cone to lie on.
With that setup, you can  backrivet 80% or more of rivets flat on the bench. That makes high quality results very easy. A short and long backrivet set is needed.
For many of the rivets that can't be backriveted flat on the bench, you can use a back rivet bucking bar (larger mushroom shaped) and bang the rivets with the backrivet set from inside the cone.  Again, most of this is easily done laying on a flat bench.
I considered most riveting that required crawling in the cone after it was hung the result of planning oversights. Everything done on the bench was done single handed.
Bill Watson

Sent from my iPad

On May 18, 2012, at 8:14 AM, "Carlos Trigo" <trigo(at)mail.telepac.pt (trigo(at)mail.telepac.pt)> wrote:

[quote]
Well, thanks for the answers, but I do know that the plans tell you to build the tail cone separately from the middle and forward fuselage.

What I want to know is if anybody used, or recommends using the QB fuselage to hang the tail cone structure, while building the tail cone.

If not, where does everybody put the tail cone while building it? Just laid over your work bench, or did you make a kind of gig?

Carlos


[quote] --


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
mauledriver(at)nc.rr.com
Guest





PostPosted: Fri May 18, 2012 5:49 am    Post subject: Building the tail cone Reply with quote

I should add that for the clecoing and match drilling you need saw horses or something to raise cone off the bench to clear the clecos. It becomes pretty obvious as you proceed.
Yes, the accuracy of the CNC stuff is simply amazing. It just all fits despite your best efforts.
Bill

Sent from my iPad

On May 18, 2012, at 9:20 AM, Bill Watson <mauledriver(at)nc.rr.com (mauledriver(at)nc.rr.com)> wrote:

[quote]Hanging it would only make it more difficult. You'll want to build the tailcne on a flat bench. No jig.
What worked well for me was large back riveting plate. Mine was about 24" x 12" x 1/4" (guesstimate) from a local scap yard. This was laid on the bench and scrap 1/4" ply from the crate was used to fit around the plate to provide a folate surface for the cone to lie on.
With that setup, you can backrivet 80% or more of rivets flat on the bench. That makes high quality results very easy. A short and long backrivet set is needed.
For many of the rivets that can't be backriveted flat on the bench, you can use a back rivet bucking bar (larger mushroom shaped) and bang the rivets with the backrivet set from inside the cone. Again, most of this is easily done laying on a flat bench.
I considered most riveting that required crawling in the cone after it was hung the result of planning oversights. Everything done on the bench was done single handed.
Bill Watson

Sent from my iPad

On May 18, 2012, at 8:14 AM, "Carlos Trigo" <trigo(at)mail.telepac.pt (trigo(at)mail.telepac.pt)> wrote:

[quote]
Well, thanks for the answers, but I do know that the plans tell you to build the tail cone separately from the middle and forward fuselage.

What I want to know is if anybody used, or recommends using the QB fuselage to hang the tail cone structure, while building the tail cone.

If not, where does everybody put the tail cone while building it? Just laid over your work bench, or did you make a kind of gig?

Carlos


[quote] --


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
trigo(at)mail.telepac.pt
Guest





PostPosted: Fri May 18, 2012 6:00 am    Post subject: Building the tail cone Reply with quote

Thanks Ed

That’s exactly the kind of answer I was looking for

Regards
Carlos


From: owner-rv10-list-server(at)matronics.com [mailto:owner-rv10-list-server(at)matronics.com] On Behalf Of Ed Kranz
Sent: sexta-feira, 18 de Maio de 2012 13:48
To: rv10-list(at)matronics.com
Subject: Re: Re: Building the tail cone


I'm just finishing up my tail cone, and I think having it attached to the fuse would just make it almost impossible to get things installed. Once you put the longerons and top skin on, it's fully rigid and doesn't need a jig.


I built mine on a pair of 2x3's screwed to the top of my bench, overhanging about 2.5 feet. I think I got this idea from Tim Olsen. Worked awesome! This both supported everything well and kept a gap between the bench top and the skins so the clecos wouldn't have interference.



I am keeping video of my entire build, so you can see exactly how it goes together here (and in later videos as well):

http://www.edandcolleen.com/tail-cone-taking-shape/



I have been able to do all construction on the tail cone single handed up to the point I'm at now.
On Fri, May 18, 2012 at 7:14 AM, Carlos Trigo <trigo(at)mail.telepac.pt (trigo(at)mail.telepac.pt)> wrote:
Well, thanks for the answers, but I do know that the plans tell you to build the tail cone separately from the middle and forward fuselage.

What I want to know is if anybody used, or recommends using the QB fuselage to hang the tail cone structure, while building the tail cone.

If not, where does everybody put the tail cone while building it? Just laid over your work bench, or did you make a kind of gig?

Carlos





Quote:
http://www.matronics.com/Navigator?RV10-List
0
Quote:
1
Quote:
2
Quote:
3
Quote:
4
Quote:
5
Quote:
6
Quote:
7
Quote:
8
Quote:
9

[quote][b]


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
trigo(at)mail.telepac.pt
Guest





PostPosted: Fri May 18, 2012 6:01 am    Post subject: Building the tail cone Reply with quote

Thanks Bill

do not archive


From: owner-rv10-list-server(at)matronics.com [mailto:owner-rv10-list-server(at)matronics.com] On Behalf Of Bill Watson
Sent: sexta-feira, 18 de Maio de 2012 14:21
To: rv10-list(at)matronics.com
Subject: Re: Re: Building the tail cone


Hanging it would only make it more difficult. You'll want to build the tailcne on a flat bench. No jig.



What worked well for me was large back riveting plate. Mine was about 24" x 12" x 1/4" (guesstimate) from a local scap yard. This was laid on the bench and scrap 1/4" ply from the crate was used to fit around the plate to provide a folate surface for the cone to lie on.



With that setup, you can backrivet 80% or more of rivets flat on the bench. That makes high quality results very easy. A short and long backrivet set is needed.



For many of the rivets that can't be backriveted flat on the bench, you can use a back rivet bucking bar (larger mushroom shaped) and bang the rivets with the backrivet set from inside the cone. Again, most of this is easily done laying on a flat bench.



I considered most riveting that required crawling in the cone after it was hung the result of planning oversights. Everything done on the bench was done single handed.



Bill Watson

Sent from my iPad


On May 18, 2012, at 8:14 AM, "Carlos Trigo" <trigo(at)mail.telepac.pt (trigo(at)mail.telepac.pt)> wrote:
[quote]
Well, thanks for the answers, but I do know that the plans tell you to build the tail cone separately from the middle and forward fuselage.

What I want to know is if anybody used, or recommends using the QB fuselage to hang the tail cone structure, while building the tail cone.

If not, where does everybody put the tail cone while building it? Just laid over your work bench, or did you make a kind of gig?

Carlos


[quote] --


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
Kellym



Joined: 10 Jan 2006
Posts: 1705
Location: Sun Lakes AZ

PostPosted: Fri May 18, 2012 6:58 am    Post subject: Building the tail cone Reply with quote

If you are just starting out, it is well worth the money to get a #40
and #30 chucking reamer. Keeps the holes rounder and more accurate, as
well as reducing need for deburring. (actually, since most holes are
dimpled, which enlarges the hole, a #41 reamer gives a finished hole
closer to AN3 rivet size). Avery and other tool sources stock the reamers.

On 5/18/2012 6:48 AM, Bill Watson wrote:
[quote] I should add that for the clecoing and match drilling you need saw
horses or something to raise cone off the bench to clear the clecos.
It becomes pretty obvious as you proceed.

Yes, the accuracy of the CNC stuff is simply amazing. It just all fits
despite your best efforts.

Bill

Sent from my iPad

On May 18, 2012, at 9:20 AM, Bill Watson <mauledriver(at)nc.rr.com
<mailto:mauledriver(at)nc.rr.com>> wrote:

> Hanging it would only make it more difficult. You'll want to build
> the tailcne on a flat bench. No jig.
>
> What worked well for me was large back riveting plate. Mine was
> about 24" x 12" x 1/4" (guesstimate) from a local scap yard. This
> was laid on the bench and scrap 1/4" ply from the crate was used to
> fit around the plate to provide a folate surface for the cone to lie on.
>
> With that setup, you can backrivet 80% or more of rivets flat on
> the bench. That makes high quality results very easy. A short and
> long backrivet set is needed.
>
> For many of the rivets that can't be backriveted flat on the bench,
> you can use a back rivet bucking bar (larger mushroom shaped) and
> bang the rivets with the backrivet set from inside the cone. Again,
> most of this is easily done laying on a flat bench.
>
> I considered most riveting that required crawling in the cone after
> it was hung the result of planning oversights. Everything done on
> the bench was done single handed.
>
> Bill Watson
>
> Sent from my iPad
>
> On May 18, 2012, at 8:14 AM, "Carlos Trigo" <trigo(at)mail.telepac.pt
> <mailto:trigo(at)mail.telepac.pt>> wrote:
>
>> Well, thanks for the answers, but I do know that the plans tell you
>> to build the tail cone separately from the middle and forward fuselage.
>>
>> What I want to know is if anybody used, or recommends using the QB
>> fuselage to hang the tail cone structure, while building the tail cone.
>>
>> If not, where does everybody put the tail cone while building it?
>> Just laid over your work bench, or did you make a kind of gig?
>>
>> Carlos
>>
>> > --


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List

_________________
Kelly McMullen
A&P/IA, EAA Tech Counselor # 5286
KCHD
Back to top
View user's profile Send private message
rleffler



Joined: 05 Nov 2006
Posts: 680

PostPosted: Fri May 18, 2012 7:07 am    Post subject: Building the tail cone Reply with quote

Serves no real advantage other than to take up more space. Following the plans in this case would be the best practice.

Sent from my iPhone

On May 18, 2012, at 7:14 AM, "Carlos Trigo" <trigo(at)mail.telepac.pt (trigo(at)mail.telepac.pt)> wrote:


Well, thanks for the answers, but I do know that the plans tell you to build the tail cone separately from the middle and forward fuselage.

What I want to know is if anybody used, or recommends using the QB fuselage to hang the tail cone structure, while building the tail cone.

If not, where does everybody put the tail cone while building it? Just laid over your work bench, or did you make a kind of gig?

Carlos


[quote] --


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List

_________________
Bob Leffler
N410BL - Phase I
http://mykitlog.com/rleffler
Back to top
View user's profile Send private message
jeff(at)westcottpress.com
Guest





PostPosted: Fri May 18, 2012 8:52 am    Post subject: Building the tail cone Reply with quote

It helps to have one of these:

[img]cid:92CBDAD4-BCE5-4ACB-9391-B457C8F9FA1F[/img]


Do Not Archive

On May 18, 2012, at 5:14 AM, Carlos Trigo wrote:
[quote]Well, thanks for the answers, but I do know that the plans tell you to build the tail cone separately from the middle and forward fuselage.

What I want to know is if anybody used, or recommends using the QB fuselage to hang the tail cone structure, while building the tail cone.

If not, where does everybody put the tail cone while building it? Just laid over your work bench, or did you make a kind of gig?

Carlos


[quote] --


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List



100_3235.jpg
 Description:
 Filesize:  149.18 KB
 Viewed:  4647 Time(s)

100_3235.jpg


Back to top
robin(at)PaintTheWeb.com
Guest





PostPosted: Fri May 18, 2012 9:25 am    Post subject: Building the tail cone Reply with quote

I strongly suggest renting one of those. There are many maintenance issues associated with ownership.


Robin
Do not archive

Sent from the new iPad

On May 18, 2012, at 10:16 AM, "Jeff Carpenter" <jeff(at)westcottpress.com (jeff(at)westcottpress.com)> wrote:



[quote] It helps to have one of these:

<100_3235.jpg>




Do Not Archive



On May 18, 2012, at 5:14 AM, Carlos Trigo wrote:
[quote] Well, thanks for the answers, but I do know that the plans tell you to build the tail cone separately from the middle and forward fuselage.

What I want to know is if anybody used, or recommends using the QB fuselage to hang the tail cone structure, while building the tail cone.

If not, where does everybody put the tail cone while building it? Just laid over your work bench, or did you make a kind of gig?

Carlos


> --


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List



100_3235.jpg
 Description:
 Filesize:  149.18 KB
 Viewed:  4646 Time(s)

100_3235.jpg


Back to top
taildragon(at)msn.com
Guest





PostPosted: Fri May 18, 2012 1:37 pm    Post subject: Building the tail cone Reply with quote

<?xml:namespace prefix="v" /><?xml:namespace prefix="o" /><![endif]--> Couldn't have done it without mine!

Roger
#40291 flying 215 hours
[quote] ---


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group