Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Step intallation

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List
View previous topic :: View next topic  
Author Message
trigo(at)mail.telepac.pt
Guest





PostPosted: Mon Mar 11, 2013 1:19 pm    Post subject: Step intallation Reply with quote

Hi there

On the QB fuselage, I came to the conclusion that most of the step installation work is already done, you only have to insert the step and final-drill the vertical hole for the AN3-20A bolt.

My problem is that, with the existing pilot holes aligned, neither the 45 ¼” distance (between the aft edge of the wing attachment bulkhead and the leading edge of the step) indicated in fig. 2 of page 30-3 is good (I have around 1” more), nor the weld at the top of the step sits flush with the skin…

Should I change anything to mate those 2 conditions, or can I just final-drill the hole like it is?

Thanks
Carlos 
[quote][b]


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
larkrv10(at)gmail.com
Guest





PostPosted: Mon Mar 11, 2013 2:11 pm    Post subject: Step intallation Reply with quote

Carlos, I only had pilot holes in the powder coated support, not the step tube, so I slid the steps in as far as required to get the right dimension.  Also search the archives as lots of later builders are putting in a solid plug in the step tube, and then drilling through the whole assembly to help keep the bolt from lossening up over time.  See Bob Newmans web site for details.
 
Rick
#40956
Southampton, Ont
On Mon, Mar 11, 2013 at 5:18 PM, Carlos Trigo <trigo(at)mail.telepac.pt (trigo(at)mail.telepac.pt)> wrote:
[quote]
Hi there
 
On the QB fuselage, I came to the conclusion that most of the step installation work is already done, you only have to insert the step and final-drill the vertical hole for the AN3-20A bolt.
 
My problem is that, with the existing pilot holes aligned, neither the 45 ¼” distance (between the aft edge of the wing attachment bulkhead and the leading edge of the step) indicated in fig. 2 of page 30-3 is good (I have around 1” more), nor the weld at the top of the step sits flush with the skin…
 
Should I change anything to mate those 2 conditions, or can I just final-drill the hole like it is?
 
Thanks
Carlos 
Quote:


get="_blank">http://www.matronics.com/Navigator?RV10-List
tp://forums.matronics.com
_blank">http://www.matronics.com/contribution


[b]


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
bill.peyton



Joined: 19 Sep 2010
Posts: 198
Location: St. Louis, MO

PostPosted: Mon Mar 11, 2013 2:34 pm    Post subject: Re: Step intallation Reply with quote

Are you sure you have the correct step on the correct side ? Also, you may want to create an access plate for the bolt in case it loosens up or the weld cracks. I believe bob Newman sells an insert for the step as Rick has posted above

- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List

_________________
Bill
WA0SYV
Aviation Partners, LLC
Back to top
View user's profile Send private message
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group