Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Scratch built spar finished

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> Zenith-List
View previous topic :: View next topic  
Author Message
TxDave



Joined: 22 Jul 2006
Posts: 168
Location: Temple, TX

PostPosted: Fri Sep 22, 2006 10:23 pm    Post subject: Scratch built spar finished Reply with quote

For all you scratch builders who are intimidated by the prospect of building your spars, I have good news. It isn't that hard. I finished my right spar today. With the lessons learned from that experience I figure the left one will take 1/3 the time to complete. Special thanks to David Barth, Randy Bryant, and Herb Heaton, who all crossed this bridge before me. Their advice was invaluable. Also thanks to Debo Cox for helping me figure out a way to bend my spar cap angles. And of course, thanks to Mr. Scott Laughlin for always answering my stupid questions.

Dave Clay
Temple, TX
601 Scratch Builder
http://www.daves601xl.com


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List



spardone2.jpg
 Description:
 Filesize:  80.49 KB
 Viewed:  432 Time(s)

spardone2.jpg



spar 025small.jpg
 Description:
 Filesize:  105.98 KB
 Viewed:  384 Time(s)

spar 025small.jpg


Back to top
View user's profile Send private message Send e-mail Visit poster's website
leinad



Joined: 19 Sep 2006
Posts: 283
Location: Central Virginia

PostPosted: Sat Sep 23, 2006 4:28 am    Post subject: Re: Scratch built spar finished Reply with quote

Dave,
Thanks for the post and the web sight.
I recently finished scratch building my spars (I thought). When reviewing the Zenith instructions I realized I had used soft AN470A-6-- rivets, not the required AN470AD-6-s. Ugh! I had remove them all, and am now waiting for the correct rivets from ACS.. on back order. Oh well, there are lots of other parts to make.
I relate this for those scratch builders who might make the same mistake.
Again, I love the web sight! Keep up the good work.
Dan Dempsey


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List

_________________
Scratch building XL with Corvair Engine
Back to top
View user's profile Send private message Visit poster's website
naumuk(at)alltel.net
Guest





PostPosted: Sat Sep 23, 2006 6:55 am    Post subject: Scratch built spar finished Reply with quote

Dan-
You had me really worried with your post, and was contemplating suicide
until I reviewed the HDS plans. They call for ADs with no suffix.
I sure would have asked Zenith if "Straight" ADs were acceptable for
your project before tearing my spars back down!
DEFINITELY ARCHIVE!!
Bill Naumuk
HDS Fuselage
Townville, Pa
---


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List
Back to top
TxDave



Joined: 22 Jul 2006
Posts: 168
Location: Temple, TX

PostPosted: Sat Sep 23, 2006 7:36 am    Post subject: Re: Scratch built spar finished Reply with quote

Hey Bill,
I believe Dan was correct. According to AC 43.13-1B page 4-17 the AN470 "A" rivets have a shear strength of 10,000 psi and a bearing strength of 25,000 psi. The AN470 "AD" rivets have a shear strength of 30,000 psi and a bearing strength of 100,000 psi. The XL plans do call for the "AD" rivets. I almost made the same mistake as Dan but was saved by the good folks at ACS. By the way, Bill, I always enjoy reading your postings. You're an asset to this forum.

Dave Clay
Temple, TX
Ch601XL scratch builder
http://www.daves601xl.com


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List
Back to top
View user's profile Send private message Send e-mail Visit poster's website
naumuk(at)alltel.net
Guest





PostPosted: Sat Sep 23, 2006 12:35 pm    Post subject: Scratch built spar finished Reply with quote

Dave-
I thought all spar rivets were AD. Dan said his plans called for AD-S.
The "S" is what threw me.
Regardless, I'm just a happy camper that I don't have a batch of the
wrong rivets buried in my outboard wings. I don't think I could take having
to rebuild them again. Not when I have the rear fuse in clecos, ready to
tear apart and polish the sides and bottom tommorow.
Sometimes I'm an asset, sometimes I use the list as depression therapy.
Whatever it takes to make progress.
Good building.
Bill Naumuk
HDS Fuselage
Townville, Pa
---


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List
Back to top
Ron Lendon



Joined: 10 Jan 2006
Posts: 685
Location: Clinton Twp., MI

PostPosted: Sat Sep 23, 2006 12:37 pm    Post subject: Re: Scratch built spar finished Reply with quote

Nice work Dave,

I just logged in to ask if the 5/16 attachment holes should go in now (laying out spars) or at assembly. I noticed from your pictures that you didn't put them in yet, so neither will I. I will just save it for latter.

This list saves me yet again!


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List

_________________
Ron Lendon
WW Corvair with Roy's Garage 5th bearing
CH 601 XLB
N601LT - Flying
http://www.mykitlog.com/rlendon
Corvair Engine Prints:
https://sites.google.com/site/corvairenginedata/
Back to top
View user's profile Send private message Send e-mail Visit poster's website
planejim(at)bellsouth.net
Guest





PostPosted: Sat Sep 23, 2006 1:35 pm    Post subject: Scratch built spar finished Reply with quote

Dan,

You will find that you will have to have quite a bit heavier bucking bar and
at least a 3X gun for those AD-6 rivets unless you are using a press to set
them.

Those "A" rivets sure were easy to set though weren't they?

I'm glad you caught this. It would have been a bad situation if you hadn't.
I know of a Thorpe T-18 that came apart in flight because the builder did
the same thing but no one caught it!

Jim Hoak

do not archive

Subject: [Norton AntiSpam] Re: Scratch built spar finished
Quote:
I recently finished scratch building my spars (I thought). When reviewing
the Zenith instructions I realized I had used soft AN470A-6-- rivets, not
the required AN470AD-6-s. Ugh! I had remove them all, and am now waiting
for the correct rivets from ACS.. on back order. Oh well, there are lots
of other parts to make.
I relate this for those scratch builders who might make the same mistake.
Again, I love the web sight! Keep up the good work.
Dan Dempsey

--------
Scratch building XL with Corvair Engine


Read this topic online here:

http://forums.matronics.com/viewtopic.php?p=63374#63374





- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List
Back to top
waj(at)quik.com
Guest





PostPosted: Sat Sep 23, 2006 3:06 pm    Post subject: Scratch built spar finished Reply with quote

Hello group ,you may want to keep in mind that all AD rivets have a small
dimple in the center for identification ,soft are plan ,no dimple. Wade
---


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List
Back to top
leinad



Joined: 19 Sep 2006
Posts: 283
Location: Central Virginia

PostPosted: Sat Sep 23, 2006 5:13 pm    Post subject: Re: Scratch built spar finished Reply with quote

waj noted:

Posted: Sat Sep 23, 2006 3:06 pm Post subject: Scratch built spar finished

--------------------------------------------------------------------------------

Hello group ,you may want to keep in mind that all AD rivets have a small
dimple in the center for identification ,soft are plan ,no dimple. Wade
---


However, the soft rivets I had looked as if they were dimpled. In the center of every rivet head is a tiny 3 or 4 digit number. I can't read it, but originally I thought it was the dimple. But the package cleary says AN470-A, not AD..
Sorry for the earlier confusion the --s was meant to signify plural.


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List

_________________
Scratch building XL with Corvair Engine
Back to top
View user's profile Send private message Visit poster's website
naumuk(at)alltel.net
Guest





PostPosted: Sat Sep 23, 2006 5:31 pm    Post subject: Scratch built spar finished Reply with quote

I realize that now, but I'm getting so gun-shy....
You had no choice but to tear everything back down if you used A instead
of AD rivets. Been there, done that. Not for the wrong rivets, but the wrong
spar cap material. 2024 instead of 6061. Thought it was a little too shiny.
Can't remember if it was ACS's or Wick's mistake.
Like the desk sarge on Hill St Blues used to say- "Be careful out there,
folks".
Bill Naumuk
HDS Fuselage
Townville, Pa
---


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List
Back to top
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> Zenith-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group