Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Rear Wing Channel in Fuselage

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> Zenith-List
View previous topic :: View next topic  
Author Message
Jaybannist(at)cs.com
Guest





PostPosted: Fri Jun 30, 2006 3:50 pm    Post subject: Rear Wing Channel in Fuselage Reply with quote

In my ZAC pictoral instructions, I have looked and looked for advice on clecoing (or riveting) the rear channel in the fuselage (6B5-2) to the bottom fuselage skin, and find nothing.  I know, from the drawings, that it requires A5s at pitch 40, but no clue as to when in the process it should be done. Anyone have an answer for me?

Jay in Dallas, working on XL fuselage.


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List
Back to top
armyret(at)mchsi.com
Guest





PostPosted: Sat Jul 01, 2006 9:04 am    Post subject: Rear Wing Channel in Fuselage Reply with quote

Jay-  Don't install the 6B5-2 until you have the center wing spar position jig (6B-13) in place. Al Young 
601XL 
[quote] ---


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List
Back to top
s_thatcher(at)bellsouth.n
Guest





PostPosted: Sat Jul 01, 2006 9:46 am    Post subject: Rear Wing Channel in Fuselage Reply with quote

Hi Jay,

6B2-5 does not get drilled or clecoed until you have the gear jig in place.
This instruction is on the newer plans from ZAC and I didn't check to see if
it was on the older plans. Since I get the condensed list you've probably
gotten an answer to this several times already Smile

<<In my ZAC pictoral instructions, I have looked and looked for advice on
clecoing (or riveting) the rear channel in the fuselage (6B5-2) to the
bottom
fuselage skin, and find nothing. I know, from the drawings, that it
requires A5s
at pitch 40, but no clue as to when in the process it should be done. Anyone
have an answer for me? Jay in Dallas, working on XL fuselage.>>

Scott
601XL working on Fuselage


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List
Back to top
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> Zenith-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group