|
Matronics Email Lists Web Forum Interface to the Matronics Email Lists
|
View previous topic :: View next topic |
Author |
Message |
wreining(at)gmail.com Guest
|
Posted: Thu Jul 13, 2006 5:43 pm Post subject: Quick Build (QB) Wings & Fuse - Steps Remaining |
|
|
Has anyone posted a detailed list of what has already been done, and what remains to be done, for the QB wings and fuselage? Ideally something that references the plans, such as: for the wings, sections xx all complete, steps yy in section zz. need to be finished. I checked the archive, but had no luck.
Bill Reining – going to OSH all week
Tail cone
40514
N475R reserved
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|
Back to top |
|
|
armywrights(at)adelphia.n Guest
|
Posted: Thu Jul 13, 2006 8:06 pm Post subject: Quick Build (QB) Wings & Fuse - Steps Remaining |
|
|
Bill, good luck on this one.
When my QB Wings and Fuse arrived, I went through the plans as thoroughly as I thought I could, noting what was left to do, but didn’t make a separate list. Even if I had, I’ve found lately that I’ve had to go back and do things that I overlooked, and then go back and fit the thing I was working on in the first place! It’s not bad because it’s kind of a checks and balances, but it sure throws you off of your rhythm when it happens.
For me, these incidental things just “get done” and I’ve not tried to annotate them when I come across them, because it’s all in the name of getting back to the original task. So a good, thorough, complete list seems like pie in the sky. There are parts of the plans, however, that do say for Slowbuild, do this, for QB, do this. That’s not everywhere in the plans, but seems to be the author’s choice when he wrote that section. Probably wouldn’t be hard for Vans to make a separate set of plans since the QB stuff is done the same way every time, but then we wouldn’t have the slow-build sections to reference in case we needed to redo a part or needed to modify something to suit our own missions.
Rob Wright
#392 QB Wings
Tru-Trak Servos delivered yesterday!
Finishing kit delivery next Thurs!
Engine paid for awaiting delivery!
Need more money/time/arms!
From: owner-rv10-list-server(at)matronics.com [mailto:owner-rv10-list-server(at)matronics.com] On Behalf Of Bill Reining
Sent: Thursday, July 13, 2006 8:42 PM
To: rv10-list(at)matronics.com
Subject: Quick Build (QB) Wings & Fuse - Steps Remaining
Has anyone posted a detailed list of what has already been done, and what remains to be done, for the QB wings and fuselage? Ideally something that references the plans, such as: for the wings, sections xx all complete, steps yy in section zz. need to be finished. I checked the archive, but had no luck.
Bill Reining – going to OSH all week
Tail cone
40514
N475R reserved
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|
Back to top |
|
|
acs(at)acspropeller.com.a Guest
|
Posted: Thu Jul 13, 2006 8:11 pm Post subject: Quick Build (QB) Wings & Fuse - Steps Remaining |
|
|
Bill this would be extremely helpful but you’ll find most likely it doesn’t exist.
The problem as I see it, is you don’t really want to encourage someone starting out from point x without the intellectual catch up on what has been done for you already, particularly when the potential is for minor variations and discrepancies between QB’s which shouldn’t happen with good QC but nonetheless does.
You will see on certain pages of the plans, references to Standard build and QB but it’s my experience that you need to read and re-read everything that’s gone before in any case to be on the safe side and to feel mentally “up to speed” with the project. Identify everything page by page as per the standard plans and verify it has been completed correctly is best engineering practice.
John 40315
[b] ACS[/b] Q
John Dunne
Managing Director
acs(at)acspropeller.com.au (acs(at)acspropeller.com.au)
Aviation Component Services (Qld) Pty Ltd.
Building 612 Lores Bonney Drive,
Archerfield Airport Queensland Australia.
PH:61 7 3274 4500 FAX:61 7 3274 4010
"Everything Propeller"
From: owner-rv10-list-server(at)matronics.com [mailto:owner-rv10-list-server(at)matronics.com] On Behalf Of Bill Reining
Sent: Friday, 14 July 2006 11:42 AM
To: rv10-list(at)matronics.com
Subject: Quick Build (QB) Wings & Fuse - Steps Remaining
Has anyone posted a detailed list of what has already been done, and what remains to be done, for the QB wings and fuselage? Ideally something that references the plans, such as: for the wings, sections xx all complete, steps yy in section zz. need to be finished. I checked the archive, but had no luck.
Bill Reining – going to OSH all week
Tail cone
40514
N475R reserved
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|
Back to top |
|
|
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
|
Powered by phpBB © 2001, 2005 phpBB Group
|