Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

when to rivet the fuselage?

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> Zenith-List
View previous topic :: View next topic  
Author Message
lrepilot(at)yahoo.com
Guest





PostPosted: Sat Sep 30, 2006 11:30 am    Post subject: when to rivet the fuselage? Reply with quote

I have the fuselage of my 601xl to the point where I
am just adding things like the gussets and similar
smaller items. I have what looks like a million clecos
hanging off the structure (actually about 600).
I have not yet drilled the top skins yet. My question
is can I un-cleco , debur and rivet the major
structure at this point or do I continue to add the
dual sticks, flap controlls etc before disassembly.

Ken

__________________________________________________


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List
Back to top
bryanmmartin



Joined: 10 Jan 2006
Posts: 1018

PostPosted: Sat Sep 30, 2006 12:10 pm    Post subject: when to rivet the fuselage? Reply with quote

I would go ahead and rivet the lower fuselage together. Then you can
leave the top skins clecoed until you get your control cables and
wires installed.
On Sep 30, 2006, at 3:28 PM, ken smith wrote:

Quote:


I have the fuselage of my 601xl to the point where I
am just adding things like the gussets and similar
smaller items. I have what looks like a million clecos
hanging off the structure (actually about 600).
I have not yet drilled the top skins yet. My question
is can I un-cleco , debur and rivet the major
structure at this point or do I continue to add the
dual sticks, flap controlls etc before disassembly.

Ken

--
Bryan Martin
N61BM, CH 601 XL,
RAM Subaru, Stratus redrive.
do not archive.


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List

_________________
--
Bryan Martin
N61BM, CH 601 XL, Stratus Subaru.
do not archive.
Back to top
View user's profile Send private message
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> Zenith-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group