skrabekk(at)charter.net Guest
|
Posted: Tue Apr 21, 2015 11:41 am Post subject: Rebuild parts |
|
|
I’ve had good help finding needed materials for my wing rebuild so far. I thought I’d try the list for a couple of more requests. Anybody have enough fabric left from other jobs to cover the wing and aleron of a twinstar? Need about 30 ft of 72 inch light 1.7 ceconite . Also need 12 ft. of leading edge 1 1/2 in. .028 tube and and 12 ft of trailing edge 1 1/4 .028 tube.Thanks for checking. Jerry
[quote][b]
| - The Matronics Kolb-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Kolb-List |
|
|
|