|
Matronics Email Lists Web Forum Interface to the Matronics Email Lists
|
View previous topic :: View next topic |
Author |
Message |
Greg McFarlane
Joined: 12 Apr 2012 Posts: 57 Location: Albany Western Australia
|
|
Back to top |
|
|
parish(at)parishmoffitt.c Guest
|
Posted: Fri Feb 15, 2019 3:34 am Post subject: Build Time |
|
|
I spent 71.5 hours on my elevators. That includes optional/ discretionary time for priming, proseal for the trailing edge, and making modification for static wicks.
As for the wing, I am 224 hours into it so far. Main wing body is complete through the top skin attached and gap fairings attached. Flaps are complete and working on the fuel tanks, probably about 60% complete but I haven't leak testing anything yet, LOL!
Hope this helps.
Sent from my T-Mobile 4G LTE Device
-------- Original message --------
From: Greg McFarlane <grbcmcfarlane(at)gmail.com>
Date: 2/15/19 04:25 (GMT-05:00)
To: rv10-list(at)matronics.com
Subject: RV10-List: Build Time
--> RV10-List message posted by: "Greg McFarlane" <grbcmcfarlane(at)gmail.com>
Can anyone give me an idea of build times in hours that have been put in to build the Elevators and also the wings (not QB) ? Know I could probably trawl through some of the excellent build logs that are around to get an idea, but hopefully this will be an easier way to get the info [Rolling Eyes] [Rolling Eyes]
Read this topic online here:
http://forums.matronics.com/viewtopic.php?p=487609#487609
_-============================================================
_-= - The RV10-List Email Forum -
_-= Use the Matronics List Features Navigator to browse
_-= the many List utilities such as List Un/Subscription,
_-= Archive Search & Download, 7-Day Browse, Chat, FAQ,
_-= Photoshare, and much much more:
_-=
_-= --> http://www.matronics.com/Navigator?RV10-List
_-=
_-============================================================
_-= - MATRONICS WEB FORUMS -
_-= Same great content also available via the Web Forums!
_-=
_-= --> http://forums.matronics.com
_-=
_-============================================================
_-= - NEW MATRONICS LIST WIKI -
_-= Add some info to the Matronics Email List Wiki!
_-= --> http://wiki.matronics.com
_-============================================================
_-= - List Contribution Web Site -
_-= Thank you for your generous support!
_-= -Matt Dralle, List Admin.
_-= --> http://www.matronics.com/contribution
_-============================================================
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|
Back to top |
|
|
isaac.schantz(at)gmail.co Guest
|
Posted: Fri Feb 15, 2019 7:04 am Post subject: Build Time |
|
|
I spent 547.5 on both wings (non-QB), not priming except where Van's required, this included pressure testing on the wing tanks. Used the Aveo Engineering ZipTips as opposed to Vans wing tips and lights. Also included the Dynon autopilot servo for the ailerons and Dynon heated pitot with mast. Don't get bogged down in the tank build. Just slog through it until done. It's not as bad as everyone out there says it is. Although more expensive, found the pro-seal in the tubes worked really well. I was really liberal with it and ended up using 18 tubes on both tanks. Leak test only showed one rivet with a leak. Easily fixed. Frustration with leaking tanks was kept to a minimum. As they say, build on!!
On Fri, Feb 15, 2019 at 4:38 AM parish <parish(at)parishmoffitt.com (parish(at)parishmoffitt.com)> wrote:
Quote: | I spent 71.5 hours on my elevators. That includes optional/ discretionary time for priming, proseal for the trailing edge, and making modification for static wicks.Â
As for the wing, I am 224 hours into it so far. Main wing body is complete through the top skin attached and gap fairings attached. Flaps are complete and working on the fuel tanks, probably about 60% complete but I haven't leak testing anything yet, LOL!Â
Hope this helps.
Sent from my T-Mobile 4G LTE Device
-------- Original message --------
From: Greg McFarlane <grbcmcfarlane(at)gmail.com (grbcmcfarlane(at)gmail.com)>
Date: 2/15/19 04:25 (GMT-05:00)
To: rv10-list(at)matronics.com (rv10-list(at)matronics.com)
Subject: Build Time
--> RV10-List message posted by: "Greg McFarlane" <grbcmcfarlane(at)gmail.com (grbcmcfarlane(at)gmail.com)>
Can anyone give me an idea of build times in hours that have been put in to build the Elevators and also the wings (not QB) ?  Know I could probably trawl through some of the excellent build logs that are around to get an idea, but hopefully this will be an easier way to get the info  [Rolling Eyes] [Rolling Eyes]
Read this topic online here:
http://forums.matronics.com/v--> http://www.matronics.===================
|
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|
Back to top |
|
|
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
|
Powered by phpBB © 2001, 2005 phpBB Group
|