lumkes(at)msoe.edu Guest
|
Posted: Wed Jan 17, 2007 7:04 am Post subject: Riveting Forward Fuselage |
|
|
Hello all,
I have searched the archives and builder's websites, and still have some questions about when to rivet what sections during the forward fuselage work report. The work report continually say "cleco X to X", next step, "cleco Z to Z", and only in a few instances to actually rivet something. Does any have guidelines or experience with how this section progresses. Is it possible to complete the entire work report (side skins, floor, instrument panel, etc.) using clecos (assuming I have enough), then disassemble the entire thing, debur, prime, reassemble, and rivet?
What other things besides the front top skin, rear top skins, and top center wings skins should be left clecoed until nearly finished and wires, cables, brake lines, etc., are installed.
Thanks! John
601HD/R912
[quote][b]
| - The Matronics Zenith-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Zenith-List |
|
|
|
Back to top |
|
|
gfmjr_20(at)HOTMAIL.COM Guest
|
Posted: Wed Jan 17, 2007 7:25 am Post subject: Riveting Forward Fuselage |
|
|
John-
At the point you are at Zenith assumes you know pretty much how to put
things together. It really doesn't matter which panels are rivted in what
order. When I got to the point that I was running low on clecos, I began
to rivet starting at the rear and moving forward. Worked for me.
George May
601XL 912s---42hours
Quote: | From: "John and Kim Lumkes" <lumkes(at)msoe.edu>
Reply-To: zenith-list(at)matronics.com
To: <zenith-list(at)matronics.com>
Subject: Riveting Forward Fuselage
Date: Wed, 17 Jan 2007 10:03:44 -0500
Hello all,
I have searched the archives and builder's websites, and still have some
questions about when to rivet what sections during the forward fuselage
work
report. The work report continually say "cleco X to X", next step, "cleco Z
to Z", and only in a few instances to actually rivet something. Does any
have guidelines or experience with how this section progresses. Is it
possible to complete the entire work report (side skins, floor, instrument
panel, etc.) using clecos (assuming I have enough), then disassemble the
entire thing, debur, prime, reassemble, and rivet?
What other things besides the front top skin, rear top skins, and top
center
wings skins should be left clecoed until nearly finished and wires, cables,
brake lines, etc., are installed.
Thanks! John
601HD/R912
|
_________________________________________________________________
| - The Matronics Zenith-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Zenith-List |
|
|
|
Back to top |
|
|
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
|
Powered by phpBB © 2001, 2005 phpBB Group
|