Posted: Fri Feb 09, 2007 8:47 am Post subject: 601XL Wing plumbing and wiring and control cables. |
|
|
I did the wiring and plumbing after the bottom skin was
riveted. This was the point when I installed the navigation lights
and strobes as well as the pitot and LRI probes.
Paul
XL fuselage
At 06:38 AM 2/9/2007, you wrote:
Quote: |
When is it best to start doing this, after the two top and bottom
skins and on and clecoed (but not riveted), and before the nose skin
is even messed with? Anybody have and timelines as to when they did
all they internal work.
--------
CH601XL - Corvair
|
-