Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

RV8-List Digest: 0 Msgs - 06/18/07

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV8-List
View previous topic :: View next topic  
Author Message
gaillard.peck.ctr(at)nell
Guest





PostPosted: Tue Jun 19, 2007 6:57 am    Post subject: RV8-List Digest: 0 Msgs - 06/18/07 Reply with quote

I'm about to start riveting the right elevator skin to the stiffners on
my RV-8 project. Next will be the elevator skeleton.

The plans call for significant trimming of the elevator lead
counterweights.
Anybody have any good advice for me on the best way to do this?

Right now I am thinking of marking the weight as per the plans and using
my band saw to cut out the major block and then either smooth the edges
with the 3M wheel or a file or a combo.

Also, the plans suggest back riveting the stiffners to the skin. I found
that increasingly hard to do on the rudder as I got closer to the
trailing edge fold.

Have heard two alternative suggestions to forcing the back rivet process
into the narrow area. One was to use the pop-rivets and the other was to
use a slim bucking bar and set those difficult rivets from the skin
side.

Advice is welcome.

Thanks,

Gail Peck
Nellis AFB, NV
Gaillard.peck.ctr(at)nellis.af.mil or gtwestern(at)aol.com
--


- The Matronics RV8-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV8-List
Back to top
N715RR



Joined: 03 Mar 2007
Posts: 2

PostPosted: Tue Jun 19, 2007 7:18 am    Post subject: RV8-List Digest: 0 Msgs - 06/18/07 Reply with quote

Just mount them with the bolts for now....Later you can take a large
drill bit and drill several holes in the lead to remove material until
the elevators balance. After they are painted you will not notice the
holes....

--


- The Matronics RV8-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV8-List
Back to top
View user's profile Send private message
jason(at)hills.org
Guest





PostPosted: Tue Jun 19, 2007 7:53 am    Post subject: RV8-List Digest: 0 Msgs - 06/18/07 Reply with quote

Gail,

1. How quickly one forgets these things... I spent a while googling
for ideas on how to do the shaping of the counter weight too. In the
end I used a saw, a course file, and a bunch of patience. Here's what
I wrote in my blog about it: http://blog.jason.hills.org/blog/
_archives/2006/10/2/2382197.html

2. I was able to back rivet all of the rivets for the stiffiners on
both elevators. Assuming you haven't bent the trailing edge yet
(should not have done that yet), go ahead and gently pry it open wide
enough to get the rivet gun all the way back there. I did it after an
experienced RV builder showed me, and assured me I wasn't going to
hurt anything, as it seemed like I was really prying on things to get
in there. After you've done a few it doesn't seem too bad. I did the
tightest two rivets on each stiffener last. I started my whole RV-8
project with the right elevator, so I did this on my first real day
of building, but I didn't write anything interesting about doing the
back riveting in my blog (http://blog.jason.hills.org/blog/_archives/
2006/9/30/2376912.html).

..Jason Hills
RV-8 (wings)
On Jun 19, 2007, at 7:56 AM, Peck Gaillard R Ctr USAFWS/CBD Training
wrote:

[quote]
Training" <gaillard.peck.ctr(at)nellis.af.mil>

I'm about to start riveting the right elevator skin to the
stiffners on
my RV-8 project. Next will be the elevator skeleton.

The plans call for significant trimming of the elevator lead
counterweights.
Anybody have any good advice for me on the best way to do this?

Right now I am thinking of marking the weight as per the plans and
using
my band saw to cut out the major block and then either smooth the
edges
with the 3M wheel or a file or a combo.

Also, the plans suggest back riveting the stiffners to the skin. I
found
that increasingly hard to do on the rudder as I got closer to the
trailing edge fold.

Have heard two alternative suggestions to forcing the back rivet
process
into the narrow area. One was to use the pop-rivets and the other
was to
use a slim bucking bar and set those difficult rivets from the skin
side.

Advice is welcome.

Thanks,

Gail Peck
Nellis AFB, NV
Gaillard.peck.ctr(at)nellis.af.mil or gtwestern(at)aol.com
--


- The Matronics RV8-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV8-List
Back to top
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV8-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group