Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

601XL - Question Re. Mating Of Elevator To Stabilizer (Piano

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> Zenith-List
View previous topic :: View next topic  
Author Message
dvanlanen



Joined: 25 Jul 2006
Posts: 122
Location: Madison, WI

PostPosted: Fri Oct 26, 2007 10:42 am    Post subject: 601XL - Question Re. Mating Of Elevator To Stabilizer (Piano Reply with quote

I’m almost ready to fit the elevator to the piano hinge, which is already drilled / clecoed to the stabilizer. Once positioned, has anyone found a good way of “stablizing” the assembly to prevent movement while drilling and clecoing?
Thanks,
Dave Van Lanen
Madison, WI
601XL - Elevator [quote][b]


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List
Back to top
View user's profile Send private message
Tim Juhl



Joined: 21 Mar 2006
Posts: 488
Location: "Thumb" of Michigan

PostPosted: Fri Oct 26, 2007 3:54 pm    Post subject: Re: 601XL - Question Re. Mating Of Elevator To Stabilizer (P Reply with quote

As I recall, I fit the two together on a table and after satisfying myself with the position of the hinge I used side clamps to attach the undrilled side in place and then pulled the pin out to separate the hinge halves. I then drilled the hinge starting in the middle and working towards the ends, clecoing as I went. When finished I chose to store the elevator and horiz. stab separately so I just slipped the pin back in one side of the hinge.

Tim


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List

_________________
______________
CFII
Champ L16A flying
Zodiac XL - Jabiru 3300A
Almost done! It'll fly in spring!
Back to top
View user's profile Send private message
Tim Juhl



Joined: 21 Mar 2006
Posts: 488
Location: "Thumb" of Michigan

PostPosted: Sun Oct 28, 2007 2:50 pm    Post subject: Re: 601XL - Question Re. Mating Of Elevator To Stabilizer (P Reply with quote

To anyone following this thread, I gave Dave bad advice. Once I went out to the shop and looked at the elev / stab I realized that side clamps could not be used in that situation. Dave and I have since communicated about it but as I now recall I used tape strips to hold the hinge in place once the proper location was established.

Next time I'll be sure before I open my big mouth and give advice.

Tim

Do not Archive


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List

_________________
______________
CFII
Champ L16A flying
Zodiac XL - Jabiru 3300A
Almost done! It'll fly in spring!
Back to top
View user's profile Send private message
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> Zenith-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group