|
Matronics Email Lists Web Forum Interface to the Matronics Email Lists
|
View previous topic :: View next topic |
Author |
Message |
tomvesely(at)comcast.net Guest
|
Posted: Mon Aug 04, 2008 7:27 am Post subject: 750 Build Time |
|
|
Any indications of how long the build time might be for the 750 in kit
form? Has the CNC element made an appreciable difference?
Tom Vesely
tomvesely(at)comcast.net
| - The Matronics Zenith701801-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Zenith701801-List |
|
|
|
Back to top |
|
|
kmccune
Joined: 22 Sep 2007 Posts: 577 Location: Wisconsin, USA
|
Posted: Mon Aug 04, 2008 10:21 am Post subject: Re: 750 Build Time |
|
|
Lime said above the match drilled holes are huge! Cleco it up and rivet. Ok you can check for burrs too and prime it too. I got the impression, though I didn't ask outright, that it was deburred already. They told me the time for the750 wing build vs a 701 wing, but don't recall the exact number ( remember I'm building from plans so it does not matter to me) but it was in the neighborhood of 1/2 the time I think. And if you think of all the time laying out rivet lines, predrilling and clecoing and drilling to size and then finally, riveting. It really sounds reasonable.
kevin
| - The Matronics Zenith701801-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Zenith701801-List |
|
_________________ “Always do what you are afraid to do.”
R.W. Emerson (1803-1882)
"Real freedom is the sustained act of being an individual." WW - 2009
"Life is a good deal...it's worth it" Feb 1969
Dorothy McCune |
|
Back to top |
|
|
Tommy Walker
Joined: 12 Jan 2006 Posts: 442 Location: Anniston, AL 36207
|
Posted: Mon Aug 04, 2008 1:45 pm Post subject: Re: 750 Build Time |
|
|
Hi Kevin,
I'm not too familiar with the "match drilled holes" phrase. Does that mean it is drilled to it's final size and no further drilling is required?
Thanks,
Tommy Walker in Alabama
Do Not Archive
kmccune wrote: | Lime said above the match drilled holes are huge! Cleco it up and rivet. Ok you can check for burrs too and prime it too. I got the impression, though I didn't ask outright, that it was deburred already. They told me the time for the750 wing build vs a 701 wing, but don't recall the exact number ( remember I'm building from plans so it does not matter to me) but it was in the neighborhood of 1/2 the time I think. And if you think of all the time laying out rivet lines, predrilling and clecoing and drilling to size and then finally, riveting. It really sounds reasonable.
kevin |
| - The Matronics Zenith701801-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Zenith701801-List |
|
_________________ Tommy Walker
N25A - Anniston, AL |
|
Back to top |
|
|
kmccune
Joined: 22 Sep 2007 Posts: 577 Location: Wisconsin, USA
|
Posted: Mon Aug 04, 2008 3:03 pm Post subject: Re: 750 Build Time |
|
|
That is what I believe it to mean, due to the phrase, cleco it together and rivet. But like I said I was more interested in the 701 so I was not paying too close attention. But the build times, I remember made my jealous of 750 builders.
I should have asked more questions, but I'm sure all this will be on the web site soon.
Hey Mark please chime in, if I'm all wet please tell me so, good info is good. Poor info from bumbling sources like me is bad!
PS... from the Zenith website " Internal wing assembly, using "match-hole" technology is ready to cleco together:"
Kevin
| - The Matronics Zenith701801-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Zenith701801-List |
|
_________________ “Always do what you are afraid to do.”
R.W. Emerson (1803-1882)
"Real freedom is the sustained act of being an individual." WW - 2009
"Life is a good deal...it's worth it" Feb 1969
Dorothy McCune |
|
Back to top |
|
|
av8or(at)cox.net Guest
|
Posted: Mon Aug 04, 2008 3:23 pm Post subject: 750 Build Time |
|
|
Match drilled holes means that the rivet hole are CNC punched undersize.
You have to cleco the parts together to check for proper fit. You then
drill (actually, reaming is better) to the final size, deburr, reassemble,
then rivet. Of course, you deburred the rest of the parts first and make
sure you use proper riveting methods (ie. don't rivet from one end to the
other). This saves the layout and jigging of structures and adds no
construction time.
This is the method RV's have been working with for years.
John
| - The Matronics Zenith701801-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Zenith701801-List |
|
|
|
Back to top |
|
|
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
|
Powered by phpBB © 2001, 2005 phpBB Group
|