Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

750 Build Time

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> Zenith701801-List
View previous topic :: View next topic  
Author Message
tomvesely(at)comcast.net
Guest





PostPosted: Mon Aug 04, 2008 7:27 am    Post subject: 750 Build Time Reply with quote

Any indications of how long the build time might be for the 750 in kit
form? Has the CNC element made an appreciable difference?

Tom Vesely
tomvesely(at)comcast.net


- The Matronics Zenith701801-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith701801-List
Back to top
kmccune



Joined: 22 Sep 2007
Posts: 577
Location: Wisconsin, USA

PostPosted: Mon Aug 04, 2008 10:21 am    Post subject: Re: 750 Build Time Reply with quote

Lime said above the match drilled holes are huge! Cleco it up and rivet. Ok you can check for burrs too and prime it too. I got the impression, though I didn't ask outright, that it was deburred already. They told me the time for the750 wing build vs a 701 wing, but don't recall the exact number ( remember I'm building from plans so it does not matter to me) but it was in the neighborhood of 1/2 the time I think. And if you think of all the time laying out rivet lines, predrilling and clecoing and drilling to size and then finally, riveting. It really sounds reasonable.

kevin


- The Matronics Zenith701801-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith701801-List

_________________
“Always do what you are afraid to do.”
R.W. Emerson (1803-1882)

"Real freedom is the sustained act of being an individual." WW - 2009

"Life is a good deal...it's worth it" Feb 1969
Dorothy McCune
Back to top
View user's profile Send private message Send e-mail
Tommy Walker



Joined: 12 Jan 2006
Posts: 442
Location: Anniston, AL 36207

PostPosted: Mon Aug 04, 2008 1:45 pm    Post subject: Re: 750 Build Time Reply with quote

Hi Kevin,

I'm not too familiar with the "match drilled holes" phrase. Does that mean it is drilled to it's final size and no further drilling is required?

Thanks,

Tommy Walker in Alabama
Do Not Archive
kmccune wrote:
Lime said above the match drilled holes are huge! Cleco it up and rivet. Ok you can check for burrs too and prime it too. I got the impression, though I didn't ask outright, that it was deburred already. They told me the time for the750 wing build vs a 701 wing, but don't recall the exact number ( remember I'm building from plans so it does not matter to me) but it was in the neighborhood of 1/2 the time I think. And if you think of all the time laying out rivet lines, predrilling and clecoing and drilling to size and then finally, riveting. It really sounds reasonable.

kevin


- The Matronics Zenith701801-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith701801-List

_________________
Tommy Walker
N25A - Anniston, AL
Back to top
View user's profile Send private message Send e-mail MSN Messenger
kmccune



Joined: 22 Sep 2007
Posts: 577
Location: Wisconsin, USA

PostPosted: Mon Aug 04, 2008 3:03 pm    Post subject: Re: 750 Build Time Reply with quote

That is what I believe it to mean, due to the phrase, cleco it together and rivet. But like I said I was more interested in the 701 so I was not paying too close attention. But the build times, I remember made my jealous of 750 builders.
I should have asked more questions, but I'm sure all this will be on the web site soon.

Hey Mark please chime in, if I'm all wet please tell me so, good info is good. Poor info from bumbling sources like me is bad! Laughing

PS... from the Zenith website " Internal wing assembly, using "match-hole" technology is ready to cleco together:"

Kevin


- The Matronics Zenith701801-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith701801-List

_________________
“Always do what you are afraid to do.”
R.W. Emerson (1803-1882)

"Real freedom is the sustained act of being an individual." WW - 2009

"Life is a good deal...it's worth it" Feb 1969
Dorothy McCune
Back to top
View user's profile Send private message Send e-mail
av8or(at)cox.net
Guest





PostPosted: Mon Aug 04, 2008 3:23 pm    Post subject: 750 Build Time Reply with quote

Match drilled holes means that the rivet hole are CNC punched undersize.
You have to cleco the parts together to check for proper fit. You then
drill (actually, reaming is better) to the final size, deburr, reassemble,
then rivet. Of course, you deburred the rest of the parts first and make
sure you use proper riveting methods (ie. don't rivet from one end to the
other). This saves the layout and jigging of structures and adds no
construction time.

This is the method RV's have been working with for years.

John


- The Matronics Zenith701801-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith701801-List
Back to top
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> Zenith701801-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group