Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Attaching the Axles

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> Zenith-List
View previous topic :: View next topic  
Author Message
lwhitlow



Joined: 15 Jan 2006
Posts: 76
Location: Valparaiso Indiana

PostPosted: Sat Nov 15, 2008 3:26 pm    Post subject: Attaching the Axles Reply with quote

OK the plans are a little light here

It says to center the axle on the bottom of the spring gear but how far up from the bottom does it go!! Pics anyone???

And do you round the bottom of the spring gear to match the round part of the axle flange?? Zenith doesn't have a picture of the blasted thing without the wheel installed

I'm gonna have a machine shop cut the mounting notches and drill the axle holes as well as make the notches for the brake caliper mounting, and I'm hoping to get it done this week, so pony up the advice kids!!!

Thanks

Larry Whitlow
601XL N69102 (reserved)
71% done 84% to go ( I'd better check my math)


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List
Back to top
View user's profile Send private message
jaybannist(at)cs.com
Guest





PostPosted: Sat Nov 15, 2008 3:58 pm    Post subject: Attaching the Axles Reply with quote

Larry,

I tried to locate the pads to minimize the work on the gear legs. I just slightly rounded the end corners of the gear legs. I have attached a couple of drawings that I used to determine the location and orientation. The drawings are to scale; but to ensure the scale, the two random short lines must be exactly 10" apart. Let me know if you have questions.





--


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List



BrakeGuide.pdf
 Description:

Download
 Filename:  BrakeGuide.pdf
 Filesize:  13.36 KB
 Downloaded:  230 Time(s)


CaliperDrill.pdf
 Description:

Download
 Filename:  CaliperDrill.pdf
 Filesize:  19.54 KB
 Downloaded:  263 Time(s)

Back to top
jaybannist(at)cs.com
Guest





PostPosted: Sat Nov 15, 2008 4:08 pm    Post subject: Attaching the Axles Reply with quote

Oops! Forgot to attach photos.

Jay in Dallas





--


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List



Zodiac11-15-06_004a.jpg
 Description:
 Filesize:  97.2 KB
 Viewed:  368 Time(s)

Zodiac11-15-06_004a.jpg



Zodiac12-20-07_002a.jpg
 Description:
 Filesize:  164.39 KB
 Viewed:  354 Time(s)

Zodiac12-20-07_002a.jpg


Back to top
bryanmmartin



Joined: 10 Jan 2006
Posts: 1018

PostPosted: Sat Nov 15, 2008 8:42 pm    Post subject: Attaching the Axles Reply with quote

I put the flat side of the axle flush with the bottom of the spring
gear and filed off the corners of the gear just enough to allow
clearance for the brake assembly. (I have the Grove wheels and axles).
I just put the assemblies together and held them against the springs
to visualize how much metal to remove to get a good fit with the least
work.

On Nov 15, 2008, at 6:26 PM, lwhitlow wrote:

Quote:


OK the plans are a little light here

It says to center the axle on the bottom of the spring gear but how
far up from the bottom does it go!! Pics anyone???

And do you round the bottom of the spring gear to match the round
part of the axle flange?? Zenith doesn't have a picture of the
blasted thing without the wheel installed

I'm gonna have a machine shop cut the mounting notches and drill the
axle holes as well as make the notches for the brake caliper
mounting, and I'm hoping to get it done this week, so pony up the
advice kids!!!

Thanks



--
Bryan Martin
N61BM, CH 601 XL,
RAM Subaru, Stratus redrive.
do not archive.


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List

_________________
--
Bryan Martin
N61BM, CH 601 XL, Stratus Subaru.
do not archive.
Back to top
View user's profile Send private message
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> Zenith-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group