|
Matronics Email Lists Web Forum Interface to the Matronics Email Lists
|
View previous topic :: View next topic |
Author |
Message |
nuckolls.bob(at)aeroelect Guest
|
Posted: Wed Feb 04, 2009 8:15 pm Post subject: Checllist Procedure for Z-13/8 Power Distribution |
|
|
At 05:26 PM 2/4/2009, you wrote:
Quote: | Bob,
The Dynon log is set up to samples data every 10 seconds, so the
short period of time is less than 20 seconds. I agree that the
amperage values may be a signal conditioning problem, but I still
believe that main alternator is seeing a substantial transient
during this test. Can this damage the alternator?
|
No, it wont.
Bob . . .
----------------------------------------)
( . . . a long habit of not thinking )
( a thing wrong, gives it a superficial )
( appearance of being right . . . )
( )
( -Thomas Paine 1776- )
----------------------------------------
| - The Matronics AeroElectric-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?AeroElectric-List |
|
|
|
Back to top |
|
|
nuckolls.bob(at)aeroelect Guest
|
Posted: Wed Feb 04, 2009 8:16 pm Post subject: Checllist Procedure for Z-13/8 Power Distribution |
|
|
At 05:26 PM 2/4/2009, you wrote:
Quote: | Bob,
The Dynon log is set up to samples data every 10 seconds, so the
short period of time is less than 20 seconds. I agree that the
amperage values may be a signal conditioning problem, but I still
believe that main alternator is seeing a
substantial transient during this test. Can this damage the alternator?
Which alternator/regulator combination are you running?
|
Bob . . .
| - The Matronics AeroElectric-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?AeroElectric-List |
|
|
|
Back to top |
|
|
Norm Biron
Joined: 04 Feb 2009 Posts: 7
|
Posted: Wed Feb 04, 2009 8:36 pm Post subject: Checllist Procedure for Z-13/8 Power Distribution |
|
|
<?xml:namespace prefix="v" /><?xml:namespace prefix="o" /><![endif]--> Bob,
I HAVE THE B & C L-60 ALTERNATOR WITH THE LR-3 CONTROLLER.
Norm
[quote] ---
| - The Matronics AeroElectric-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?AeroElectric-List |
|
|
|
Back to top |
|
|
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
|
Powered by phpBB © 2001, 2005 phpBB Group
|