Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Phase I Log book wording?

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List
View previous topic :: View next topic  
Author Message
jim(at)CombsFive.Com
Guest





PostPosted: Sat Feb 28, 2009 8:35 am    Post subject: Phase I Log book wording? Reply with quote

We are almost done with our Phase I time. Can someone point me to the exact wording or phrases that should be put into the logs?Thanks, Jim CN312F - Flying Phase I (38.2 Hours) One VERY FUN airplane to fly!FYI - There is an RV Fly-In at the Madison Richmond Airport (I39) next Saturday March 7th. If anyone is close by come on. It's usually a 9 to 4 event and we get quite a few aircraft (100+). To date there has not been a -10 there. There will be at least one this year!Do Not Archive [quote][b]

- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
rene(at)felker.com
Guest





PostPosted: Sat Feb 28, 2009 8:46 am    Post subject: Phase I Log book wording? Reply with quote

They should be in your operating limitations.

Here are mine..

Phase 1 All test flights at a minimum must be conducted DAY VFR to the scope and detail of Advisory Circular 90-89 (Amateur-built Aircraft and Ultralight Flight Testing Handbook).  Following satisfactory completion of the required number of flight hours in the flight test area, the pilot shall certify in the records that the aircraft has been shown to comply with § 91.319(b). Compliance with § 91.319(b) shall be recorded in the aircraft records with the following or a similarly worded statement:
              "I certify that the prescribed flight test hours have been completed and the aircraft is controllable throughout its normal range of speeds and throughout all maneuvers to be executed, has no hazardous operating characteristics or design features, and is safe for operation. The following aircraft operating data has been demonstrated during the flight testing: speeds,         Vso ______, Vx ______, and Vy ______, and the weight______ and CG location______ at which they were obtained".


Rene'
801-721-6080


--


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
jim(at)CombsFive.Com
Guest





PostPosted: Sat Feb 28, 2009 8:51 am    Post subject: Phase I Log book wording? Reply with quote

Excellent!Thanks, Jim C ------------------------------------They should be in your operating limitations.Rene'801-721-6080 [quote][b]

- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
dlm46007(at)cox.net
Guest





PostPosted: Sat Feb 28, 2009 9:46 am    Post subject: Phase I Log book wording? Reply with quote

see you operating limitations for the wording...

From: owner-rv10-list-server(at)matronics.com [mailto:owner-rv10-list-server(at)matronics.com] On Behalf Of jim(at)CombsFive.Com
Sent: Saturday, February 28, 2009 9:35 AM
To: rv10-list(at)matronics.com
Subject: Phase I Log book wording?

We are almost done with our Phase I time.

Can someone point me to the exact wording or phrases that should be put into the logs?

Thanks, Jim C
N312F - Flying Phase I (38.2 Hours) One VERY FUN airplane to fly!

FYI - There is an RV Fly-In at the Madison Richmond Airport (I39) next Saturday March 7th. If anyone is close by come on. It's usually a 9 to 4 event and we get quite a few aircraft (100+). To date there has not been a -10 there. There will be at least one this year!

Do Not Archive [quote]

href="http://www.matronics.com/Navigator?RV10-List">http://www.matronics.com/Navigator?RV10-List
href="http://forums.matronics.com">http://forums.matronics.com
href="http://www.matronics.com/contribution">http://www.matronics.com/c
[b]


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group