Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Section 11

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List
View previous topic :: View next topic  
Author Message
Strasnuts



Joined: 10 Feb 2009
Posts: 502
Location: Salt Lake City, UT

PostPosted: Fri Mar 20, 2009 6:59 pm    Post subject: Section 11 Reply with quote

Just wondering if I should attach the horizontal and vertical or wait until the plane is closer to being finished. Also should I wait for the fiberglass tips too. I just finished my tailcone and my wing is already here. I would think Van's would put it off until the end if it was more convenient.

- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List

_________________
40936
RV-10 SB N801VR Flying
780 Hours
SuperSTOL 60 hours
Back to top
View user's profile Send private message Send e-mail
pascal(at)rv10builder.net
Guest





PostPosted: Fri Mar 20, 2009 8:53 pm    Post subject: Section 11 Reply with quote

numerous ways to look at this.
What I did was "built" the vertical and horizontal but did not match drill
the fiberglass parts. Now that I am at the finishing kit about to put the
gear on, I went back and finished off the fiberglass pieces with the added
experience of the canopy and doors.
With that said here are the ways to look at this
1) if you have time waiting for the next kit and you're ready to do it,
finish off all but riveting on the fiberglass.
2) If you have the next kit and are ready to keep going, come back to it
later , if it's in a garage do it before raising the fusellage up on the
gear
3) You can do it at the hangar when all is done and you are finishing up
everything

As far as convenient, you need to decide how accessible everything is now-
if you can readily work on the parts on a bench that would work, having it
on the fusellage worked better for me, height wise, having it on the gear
would have had it higher and been more difficult to reach as I did while it
was lower, plus at the end of the build I didn't see wanting to have to get
this done, one main reason is the fiberglass requires some work to make it
fit the way I want it and waiting for flox, plys, etc to cure is not
something I wanted to do at a airport that is 1 hour away from me.
I have seen and talked to numerous builders each did section 11 and 12 at
different times, it really doesn't matter, do it when it's best for you.
Pascal
#40720

--------------------------------------------------
From: "Strasnuts" <sean(at)braunandco.com>
Sent: Friday, March 20, 2009 6:59 PM
To: <rv10-list(at)matronics.com>
Subject: Section 11

Quote:


Just wondering if I should attach the horizontal and vertical or wait
until the plane is closer to being finished. Also should I wait for the
fiberglass tips too. I just finished my tailcone and my wing is already
here. I would think Van's would put it off until the end if it was more
convenient.

--------
A&amp;P, ATP
typed CE-525(s), CE-500
RV-10 emp started!!!!
N801VR reserved


Read this topic online here:

http://forums.matronics.com/viewtopic.php?p 35463#235463





- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
Strasnuts



Joined: 10 Feb 2009
Posts: 502
Location: Salt Lake City, UT

PostPosted: Sat Mar 21, 2009 10:31 am    Post subject: Section 11 Reply with quote

Thanks Pascal, That is the info I needed.
---


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List

_________________
40936
RV-10 SB N801VR Flying
780 Hours
SuperSTOL 60 hours
Back to top
View user's profile Send private message Send e-mail
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group