Posted: Sat Nov 14, 2009 9:19 am Post subject: Part 5 is up on the zenith.aero site and I have questions |
|
|
Hi Larry,
I think it is premature to worry about installing the changes on home
built planes now.
I understand ZAC is working very hard to put together a kit and
instructions for us to use when installing the changes. I also
understand the information released so far as the AMD update is not
complete. It covers a number of changes but the stuff I have seen
doesn't cover control system and aileron mass balance changes. I
don't know what else in the "Package" has been left out of the AMD
package. Remember the primary plan is for AMD owners to return their
planes to the factory for upgrade. For those who don't, there is
still the requirement for licensed mechanics to do the changes. The
AMD package just isn't designed for home builder use.
Shirley (the gal in charge of nearly everything at ZAC including
sales and answering the phone) informed me it would be several weeks
before the upgrade kit was ready for distribution. For my money and
time, I think I will continue to build my next plane until the kit is in hand.
Paul
XL ready to order upgrade kit
P.S. On the solid rivet question, I suspect several RV builders in
your local EAA chapter will be happy to help with the few rivets we
need on the spars. They have to install about 30,000 of those little
things on an RV. Failing that, the bolt option might work out better
if you don't have equipment and experience with bucking rivets. The
obvious problem with bolts is the question someone raised a few days
ago about inspecting the nuts to see they are still tight after the
wing is closed up.
At 08:57 AM 11/14/2009, you wrote:
Quote: |
The attachment of the new angle to the wing spar is up and now I'm curious.
The released drawings show 6-ZU-1-1 being attached by AN3 or AN4
bolts yet the pics on segment 5 show solid rivets being used
Questions
1 Are solid rivets the way this is going to be done?? I have never
driven a solid rivet and don't have any of the tools. With something
as critical as the wing spar I'm not sure this is the correct place
to learn this skill.
2. Can these rivets be set using a squeezer?? I could rent one of
those and would feel better about the quality of my work here.
3. What happened to the bolt idea?? Why was it changed?? Just
curious I'm not thinking anything bad is going on here.
I think the Zenith boys are making things a good as they can right
now. I'm very happy with the flow of info and whats going on so far.
It could have happened sooner but at least were moving now.
It appears that my decision NOT to rivet the top wing skins on was
spot on, but I'm concerned about the seats. The bottom edge of my
seats is riveted in from the bottom, through the landing gear
channel. Are we gonna have to drop the gear to remove the seat pan
to work on the center section or will there be enough room to do the
work with these still riveted at the back?
I got more but lets let these simmer for a bit
Larry Whitlow
601XL Jabiru 3300
It will fly the only question is when
|
| - The Matronics Zenith-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Zenith-List |
|
|
|
Back to top |
|
|
lwhitlow
Joined: 15 Jan 2006 Posts: 76 Location: Valparaiso Indiana
|
Posted: Sat Nov 14, 2009 10:32 am Post subject: Re: Part 5 is up on the zenith.aero site and I have questi |
|
|
Hi Paul
By the way thanks for all the useful info you have passed along in the past couple of weeks!!
I'm gonna have to disagree that its premature to be concerned about the home built planes now. I've been avoiding closing up areas that were likely to need changes (wings) and now that center section work is needed I have to stop in the cabin area and remove some parts to gain access. My time is important to me and without a timely delivery of the mod kit parts, I'm stopped from making progress. I can get useful work done, in prepping the areas that will be affected by the mods. I just want to make sure I'm working off of the best information available.
Paul, I don't think you are saying that Zenith is more concerned about the AMD planes. The AMD planes are no more important than mine or yours or anyone elses, and they will all require the same mods, so all of the how and why and changes will apply to everyone. I don't think the guys at Zenith are worried about AMD and how it will get done. We should be all equal here. It would be a terrible move on Zenith's part to get parts and procedures to AMD ahead of getting them to the home builders. Home builders are the basis for Zenith to make the kits for the AMD planes. It's the same plane, we are all in the same boat, First come first serve. I've got a Credit card ready as soon as Shirley will take it to get the mod parts here.
Besides I think the kit of mod parts is soon to come. Search You-Tube there's a video put up by Zenith of the mod parts, they just haven't linked it to the blog yet. I'm happy with their pace here, but notes as they go along with the prototype mods would be great. It helps those of us who want to keep moving understand the issues we are going to face and to make arrangements to get this mandatory work done. My goal has always been to get this bird to Oshkosh in 2010 and that is still within reach easily, I just want to keep making progress.
And the rivet question, My EAA chapter here is oddly absent RV builders. There might be one I think but..... ITs mostly the Rag and tube or Rag and wood crowd (Purists ) around here There's a glass or two and a few Zenith guys ( HD and HDS all flying! ) I'm the only metal and Zenith builder here. The guys are great and have been a great help but the metal crowd is not large here!!
I still cannot call this an upgrade. While I welcome the changes and expect a stronger airframe, Its not an upgrade if its required. Its a safety of flight modification, but no one wants to call it that. I don't care if they call it cosmetic changes, just bend and cut some metal, make me some drawings and get it in a box with my name on it
Larry Whitlow
601XL
| - The Matronics Zenith-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Zenith-List |
|
|
|
Back to top |
|
|
chris Sinfield
Joined: 28 Nov 2006 Posts: 270 Location: Sydney Australia
|
Posted: Sat Nov 14, 2009 1:44 pm Post subject: what to do whilst waiting for the mods |
|
|
ALL
Well as someone who is past the wings and fuse stage, I can tell you thee is still plenty to do whilst waiting
Spend a couple of weeks doing your Electrical / wiring diagrams , start running wires, start making the seats and covers. That will take a few weeks
Chris
| - The Matronics Zenith-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Zenith-List |
|
|
|
Back to top |
|
|
lwhitlow
Joined: 15 Jan 2006 Posts: 76 Location: Valparaiso Indiana
|
Posted: Sat Nov 14, 2009 3:40 pm Post subject: Re: what to do whilst waiting for the mods |
|
|
Ohh Kind sir
All i have left in the interior is the seats Electrical is 99% done I do have to cut install and rig the control cables but they would be in the way right now with the center section mod so I'll hold on those. I'm gonna pull the sticks and the center section console tomorrow to start opening up the area.
I was closer to the finish line but now I'm still close its just moved a little farther down the road
Larry
Very Optimistic
chris Sinfield wrote: | ALL
Well as someone who is past the wings and fuse stage, I can tell you thee is still plenty to do whilst waiting
Spend a couple of weeks doing your Electrical / wiring diagrams , start running wires, start making the seats and covers. That will take a few weeks
Chris |
| - The Matronics Zenith-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Zenith-List |
|
|
|
Back to top |
|
|
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
|
Powered by phpBB © 2001, 2005 phpBB Group
|