|
Matronics Email Lists Web Forum Interface to the Matronics Email Lists
|
View previous topic :: View next topic |
Author |
Message |
dlm34077(at)q.com Guest
|
Posted: Tue Jan 10, 2012 4:22 pm Post subject: Slick magneto inspection |
|
|
Anyone performing the 500 hour inspection SB ? I know that 135 operators are required but in the “good” old days magnetos went to 1500-2000 hours.
[quote][b]
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|
Back to top |
|
|
Kellym
Joined: 10 Jan 2006 Posts: 1705 Location: Sun Lakes AZ
|
Posted: Tue Jan 10, 2012 4:56 pm Post subject: Slick magneto inspection |
|
|
For Slick magnetos it is highly recommended. From what I have seen the
inards are not as durable as a Bendix. Since you can do it yourself, all
you need is points, condenser, and the correct lube. IIRC Slick even has
tools to ensure you get the E gap correct, etc. In turbo-ed motors with
pressurized Slicks they often don't make 500 hours.
On 1/10/2012 5:14 PM, DLM wrote:
Quote: |
Anyone performing the 500 hour inspection SB ? I know that 135
operators are required but in the “good” old days magnetos went to
1500-2000 hours.
*
*
|
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
_________________ Kelly McMullen
A&P/IA, EAA Tech Counselor # 5286
KCHD |
|
Back to top |
|
|
davidsoutpost(at)comcast. Guest
|
Posted: Tue Jan 10, 2012 5:21 pm Post subject: Slick magneto inspection |
|
|
Timely post. I just packaged my O-235 Slicks up and am sending them to these folks: http://www.aircraftmagnetoservices.com/
David Clifford
RV-10 Builder
Howell, MI
From: "DLM" <dlm34077(at)q.com>
To: rv10-list(at)matronics.com
Sent: Tuesday, January 10, 2012 7:14:09 PM
Subject: Slick magneto inspection
<![endif]--> <![endif]-->
Anyone performing the 500 hour inspection SB ? I know that 135 operators are required but in the “good” old days magnetos went to 1500-2000 hours.
[quote]
get="_blank">http://www.matronics.com/Navigator?RV10-List
tp://forums.matronics.com
_blank">http://www.matronics.com/contribution
[b]
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|
Back to top |
|
|
kdbelue(at)charter.net Guest
|
Posted: Wed Jan 11, 2012 6:21 am Post subject: Slick magneto inspection |
|
|
It seems that every time I have a mag failure it is around 500hrs, so I don't skip the inspections. I think you'd be very lucky to get 1500 hrs without doing anything.
Kevin Belue
RV-10
RV-6A
Sent from my iPhone
On Jan 10, 2012, at 6:14 PM, "DLM" <dlm34077(at)q.com (dlm34077(at)q.com)> wrote:
[quote]
Anyone performing the 500 hour inspection SB ? I know that 135 operators are required but in the “good” old days magnetos went to 1500-2000 hours.
[b]
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|
Back to top |
|
|
sean(at)stephensville.com Guest
|
Posted: Wed Jan 11, 2012 6:44 am Post subject: Slick magneto inspection |
|
|
No advice, but I watched a good EAA Webinar on magnetos last week.
http://www.eaavideo.org/video.aspx?v=1367499350001
I have little to no experience with the items in front of the stainless
so I am trying to learn all I can before the engine arrives.
-Sean #40303 (prepping for IFR checkride, nerves frayed )
On 1/11/12 8:11 AM, Kevin Belue wrote:
Quote: | It seems that every time I have a mag failure it is around 500hrs, so
I don't skip the inspections. I think you'd be very lucky to get 1500
hrs without doing anything.
Kevin Belue
RV-10
RV-6A
Sent from my iPhone
On Jan 10, 2012, at 6:14 PM, "DLM" <dlm34077(at)q.com
<mailto:dlm34077(at)q.com>> wrote:
> Anyone performing the 500 hour inspection SB ? I know that 135
> operators are required but in the “good” old days magnetos went to
> 1500-2000 hours.
>
> *
>
> ===================================
> ref="http://www.matronics.com/Navigator?RV10-List">http://www.matronics.com/Navigator?RV10-List
> ===================================
> ums.matronics.com">http://forums.matronics.com
> ===================================
> http://www.matronics.com/contribution">http://www.matronics.com/contribution
> ===================================
>
> *
*
*
|
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|
Back to top |
|
|
dmaib(at)mac.com Guest
|
Posted: Wed Jan 11, 2012 7:10 am Post subject: Slick magneto inspection |
|
|
I watched the EAA Webinar on magnetos last week as well. It was very
informative. I learned a lot about magnetos, and will definitely be
sending mine out for IRAN at 500 hours. I also would not consider
doing it myself or having the local A&P do it after attending the
webinar. For me, a certified magneto shop is the way to go.
David Maib
RV-10 40559
Flying
On Jan 11, 2012, at 9:41 AM, Sean Stephens wrote:
Quote: |
<sean(at)stephensville.com>
No advice, but I watched a good EAA Webinar on magnetos last week.
http://www.eaavideo.org/video.aspx?v=1367499350001
I have little to no experience with the items in front of the
stainless so I am trying to learn all I can before the engine arrives.
-Sean #40303 (prepping for IFR checkride, nerves frayed )
On 1/11/12 8:11 AM, Kevin Belue wrote:
> It seems that every time I have a mag failure it is around 500hrs,
> so I don't skip the inspections. I think you'd be very lucky to
> get 1500 hrs without doing anything.
>
> Kevin Belue
> RV-10
> RV-6A
>
> Sent from my iPhone
>
> On Jan 10, 2012, at 6:14 PM, "DLM" <dlm34077(at)q.com
> <mailto:dlm34077(at)q.com>> wrote:
>
>> Anyone performing the 500 hour inspection SB ? I know that 135
>> operators are required but in the “good” old days magnetos went
>> to 1500-2000 hours.
>>
>> *
>>
>> ===================================
>> ref="http://www.matronics.com/Navigator?RV10-List">http://
>> www.matronics.com/Navigator?RV10-List
>> ===================================
>> ums.matronics.com">http://forums.matronics.com
>> ===================================
>> http://www.matronics.com/contribution">http://www.matronics.com/
>> contribution
>> ===================================
>>
>> *
> *
> *
|
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|
Back to top |
|
|
rv10pro(at)gmail.com Guest
|
Posted: Wed Jan 11, 2012 7:22 am Post subject: Slick magneto inspection |
|
|
Yes. Too much of the Slick component need attention before 1000 hours.
Bendix were built like a tank and "seemed" to go longer.
Lighter weight and more frequent checks for wear. Not withstanding that bad set of carbon contacts a few years ago "as found new" on Slicks.
Trust but verify not later than 500. Retiming annually is the minor adjustment for normal wear.
John On Jan 11, 2012 6:27 AM, "Kevin Belue" <kdbelue(at)charter.net (kdbelue(at)charter.net)> wrote:[quote] It seems that every time I have a mag failure it is around 500hrs, so I don't skip the inspections. I think you'd be very lucky to get 1500 hrs without doing anything.
Kevin Belue
RV-10
RV-6A
Sent from my iPhone
On Jan 10, 2012, at 6:14 PM, "DLM" <dlm34077(at)q.com (dlm34077(at)q.com)> wrote:
Quote: |
Anyone performing the 500 hour inspection SB ? I know that 135 operators are required but in the “good” old days magnetos went to 1500-2000 hours.
get="_blank">http://www.matronics.com/Navigator?RV10-List
tp://forums.matronics.com
_blank">http://www.matronics.com/contribution
|
[b]
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|
Back to top |
|
|
dmasys
Joined: 10 Dec 2011 Posts: 22
|
Posted: Wed Jan 11, 2012 7:26 am Post subject: Slick magneto inspection |
|
|
Aircraft Magneto Services is in our neighborhood here in the Pacific Northwest, and they are terrific. It's actually a little house in the forest on Bainbridge Island, though for many years they were on the field at Paine Field in Everett, WA until the rent went through the roof (halo effect of Boeing's final assembly operations there having $100 billion or so of orders on the books).
I asked the owner whether I could do my own magneto maintenance, since I had gotten the mag service kit from Spruce. He said that the major expense is not the tools to rebuild the magneto, it's the test equipment they use. After rebuilding they put every magneto in an oven to heat it up for a few hours, then do a waveform inspection of its spark output while hot and running at high RPM. I was impressed that when they put their yellow tag on a mag, it is a quality piece of work.
Interestingly, they had to replace the shaft and bearings on one of my Slick that was 500 hrs since factory new and installed by Lycoming -- still had the Lycoming yellow paint on the hold-down nuts from the factory build. They showed me where Lycoming had failed to put shaft lubricant on the mag during installation, resulting in overheating, corrosion, and a slightly bent shaft. I had no idea, since that mag had always timed perfectly.
So, would anybody be interested in a completely unused magneto assembly and timing kit? (see http://www.aircraftspruce.com/catalog/eppages/slickassykit.php )
Like David, from this point forward I just put 'em in a box every 500 hrs and send them to the folks who really know their stuff.
-Dan Masys
RV-10 N104LD 510 hrs
RV-12 N122LD 98 hrs
| - The Matronics RV10-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?RV10-List |
|
|
|
Back to top |
|
|
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum
|
Powered by phpBB © 2001, 2005 phpBB Group
|