Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Riviting the elevator hinge ?

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> Zenith-List
View previous topic :: View next topic  
Author Message
jeffhudson



Joined: 10 Jan 2006
Posts: 15

PostPosted: Tue Jun 13, 2006 7:33 pm    Post subject: Riviting the elevator hinge ? Reply with quote

I am ready to start riviting the elevator together. Is it OK to rivet the hinge to both the elevator and HS at this time? The plans don't specify. Thanks, Jeff Hudson.

- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List
Back to top
View user's profile Send private message Send e-mail
Gig Giacona



Joined: 10 Jan 2006
Posts: 1416
Location: El Dorado Arkansas USA

PostPosted: Wed Jun 14, 2006 5:48 am    Post subject: Re: Riviting the elevator hinge ? Reply with quote

I went ahead and rivited it when I built it and it isn't a probelm that I can see.

- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List

_________________
W.R. "Gig" Giacona
601XL Under Construction
See my progress at www.peoamerica.net/N601WR
Back to top
View user's profile Send private message Send e-mail Visit poster's website
larry(at)macsmachine.com
Guest





PostPosted: Wed Jun 14, 2006 5:50 am    Post subject: Riviting the elevator hinge ? Reply with quote

Jeff,
Don't get in a hurry. The functional aspect of your elevator is way
more important than just putting them together. Make sure your
elevator is complete and fits within the stabilizer correctly first.
Take the time to see that your hinge is not dragging on an opposing
piece and fit it with an appropriate gap so you don't drag paint off
the hinge when you finish it. Do see to the trim mechanism in your
elevator if you intend to have one. Would suggest that you make the
elevator hinge the last connection you disassemble so that you can
ultimately paint the elevator separately. Much easier if the stab and
elevator disassemble from the plane separately. And by all means, do
secure the hinge one side at a time to be sure it doesn't get out of
line. A binding elevator can be a serious problem in flight.

Larry McFarland - 601HDS at www.macsmachine.com
do not archive

Hudsonmusic1(at)aol.com wrote:

Quote:
I am ready to start riviting the elevator together. Is it OK to rivet
the hinge to both the elevator and HS at this time? The plans don't
specify. Thanks, Jeff Hudson.


- The Matronics Zenith-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?Zenith-List
Back to top
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> Zenith-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group