Matronics Email Lists Forum Index Matronics Email Lists
Web Forum Interface to the Matronics Email Lists
 
 Get Email Distribution Too!Get Email Distribution Too!    FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Section 30-3 The Steps

 
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List
View previous topic :: View next topic  
Author Message
johngoodman



Joined: 18 Sep 2006
Posts: 530
Location: GA

PostPosted: Wed Sep 17, 2008 11:37 am    Post subject: Section 30-3 The Steps Reply with quote

Helped a friend do his steps last night and I'm doing mine today. In both cases, the pre drilled hole in the WD-1007 steps are not in the correct position. In my case the new hole I will have to drill will actually join with the pre drilled hole creating a "figure eight."
I'd be better off if Van had not put any hole in the steps at all. Because of these two experiences, I'm guessing others have run into this as well. Sizing up to an AN4 worked for my friend but is a poor option for me. A search of the forums didn't yield any results and no one has commented on it in their personal web sites.
Perhaps these steps are generic for all of Van's tricycle gear airplanes and the hole was for the RV-6A?
John


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List

_________________
#40572 Phase One complete in 2011
Back to top
View user's profile Send private message Send e-mail Visit poster's website
pascal(at)rv10builder.net
Guest





PostPosted: Wed Sep 17, 2008 12:51 pm    Post subject: Section 30-3 The Steps Reply with quote

Thanks for the reference in question of 30-3 makes for easier reviewing.
I 'm not sure I understand the pre-drilled piece.. mine had no hole in the
step, I needed to match drill it (step 3) .
Pascal
--------------------------------------------------
From: "johngoodman" <johngoodman(at)earthlink.net>
Sent: Wednesday, September 17, 2008 12:38 PM
To: <rv10-list(at)matronics.com>
Subject: Section 30-3 The Steps

Quote:


Helped a friend do his steps last night and I'm doing mine today. In both
cases, the pre drilled hole in the WD-1007 steps are not in the correct
position. In my case the new hole I will have to drill will actually join
with the pre drilled hole creating a "figure eight."
I'd be better off if Van had not put any hole in the steps at all. Because
of these two experiences, I'm guessing others have run into this as well.
Sizing up to an AN4 worked for my friend but is a poor option for me. A
search of the forums didn't yield any results and no one has commented on
it in their personal web sites.
Perhaps these steps are generic for all of Van's tricycle gear airplanes
and the hole was for the RV-6A?
John

--------
#40572 QB Fuselage, wings finished
N711JG reserved


Read this topic online here:

http://forums.matronics.com/viewtopic.php?p 4820#204820





- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
wcurtis(at)nerv10.com
Guest





PostPosted: Wed Sep 17, 2008 1:44 pm    Post subject: Section 30-3 The Steps Reply with quote

Same here; my WD-1007 steps had no hole in them however the WD-1008 Step Mounting bracket had pilot holes.

http://nerv10.com/wcurtis/08fuselage/fuselage30a.html

William
http://nerv10.com/wcurtis/

------


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
johngoodman



Joined: 18 Sep 2006
Posts: 530
Location: GA

PostPosted: Thu Sep 18, 2008 4:11 am    Post subject: Re: Section 30-3 The Steps Reply with quote

The two sets of WD-1007 steps that we have are pre drilled for an AN3 bolt. I'm obviously going to have to move on, so I'll probably take mine to a welding shop and get them closed up.
John


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List

_________________
#40572 Phase One complete in 2011
Back to top
View user's profile Send private message Send e-mail Visit poster's website
Lew Gallagher



Joined: 04 Jan 2008
Posts: 402
Location: Greenville , SC

PostPosted: Thu Sep 18, 2008 4:30 am    Post subject: Re: Section 30-3 The Steps Reply with quote

Hey John,

I'm sure you've checked this, but you do know there's a left and right? Ours were pre-drilled also and probably the same amount off according to the plans, but we decided they were close enough, Van's did it, and we went with the pre-drilled holes.

Later, - Lew (building lots of Bluefish fillets instead of airframes these two weeks)

do not archive


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List

_________________
non-pilot
crazy about building
NOW OFICIALLY BUILDER #40549
Fly off completed !
Back to top
View user's profile Send private message Send e-mail
johngoodman



Joined: 18 Sep 2006
Posts: 530
Location: GA

PostPosted: Thu Sep 18, 2008 6:12 am    Post subject: Re: Section 30-3 The Steps Reply with quote

OK folks, I called Van's Tech Support on this one and they were surprised there was a pre drilled hole in the WD-1007-L & -R. When I told them that it moves the step from 45 1/4 inches to 46 inches, they said drop a bolt in it and move on. Turns out the 45 1/4 is a minimum to ensure flap clearance, nothing sinister like aerodynamics or something.

John


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List

_________________
#40572 Phase One complete in 2011
Back to top
View user's profile Send private message Send e-mail Visit poster's website
pascal(at)rv10builder.net
Guest





PostPosted: Thu Sep 18, 2008 6:29 am    Post subject: Section 30-3 The Steps Reply with quote

This week I have discovered that Van's is making constant adjustments to the
RV-10 kits. I have parts that someone else has, (steps w/o a hole) I have a
a different fuel selector configuration that the previous revision called
for and I've noticed other differences.
This makes me think that VAN's is listening to the calls and e-mails we
place and making adjustments based on feedback in certain situations. I
called and asked for other prop options this last year, now appears they are
now considering the ASC II.
I think it's critical that those who are not calling or e-mailing Van's Tech
support questions or concerns (seal too big for doors) start doing so, I
think if they receive enough feedback on one section they will make
corrections.
Pascal
--------------------------------------------------
From: "Lew Gallagher" <lewgall(at)charter.net>
Sent: Thursday, September 18, 2008 5:30 AM
To: <rv10-list(at)matronics.com>
Subject: Re: Section 30-3 The Steps

Quote:


Hey John,

I'm sure you've checked this, but you do know there's a left and right?
Ours were pre-drilled also and probably the same amount off according to
the plans, but we decided they were close enough, Van's did it, and we
went with the pre-drilled holes.

Later, - Lew (building lots of Bluefish fillets instead of airframes
these two weeks)

do not archive

--------
non-pilot
crazy about building
NOW OFICIALLY BUILDER #40549
Engine and FF here, now cowl and baffels,waiting on prop.


Read this topic online here:

http://forums.matronics.com/viewtopic.php?p 4899#204899





- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
Space Cadet



Joined: 10 Jan 2008
Posts: 14
Location: Denver

PostPosted: Thu Sep 18, 2008 12:43 pm    Post subject: Re: Section 30-3 The Steps Reply with quote

Just to pipe in, my steps also had the pre-drilled hole, also were off by the same amount, I also called and talked to tech support, who also acted surprised and gave me the same response. At least they're consistent.

Dwight


- The Matronics RV10-List Email Forum -
 

Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:

http://www.matronics.com/Navigator?RV10-List
Back to top
View user's profile Send private message
Display posts from previous:   
Post new topic   Reply to topic    Matronics Email Lists Forum Index -> RV10-List All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group