Yellowhammer
Joined: 21 Mar 2018 Posts: 101 Location: Franklinton, Louisiana
|
Posted: Sun Jun 30, 2019 4:33 pm Post subject: Update on my Building Process |
|
|
Dear Pulsar Drivers, Owners, and Builders,
I am extremely hard at work building my Pulsar!
It seems things go so slow. I have been working hard on the landing gear install (tricycle type) and it has been kicking my posterior. Nothing too bad. I feel like a Circus monkey after every build session on the gear. From Installing the Lugs to getting the sweep per specifications to installing the composite and metal gussets I am a little worn out but not at all deterred!!
I am such a worrier that I am sure it is taking me longer to build than most other folks. I will study the instructions, look at pictures, measure, dry fit, only to find something a tad bit out of place. Then make adjustments and do it all over again. What a learning experience this has been for me.
I have also been completing my fuel tank. I try to have two components going at the same time so while one thing is setting I can have something else to work on in the mean time,
I will post some pictures as soon as I can to get some seasoned eyes to check my progress. I just feel I do not have much to show at this point.
I pray all are doing well and enjoying you're summer!
If anyone would like to share any construction photographs of their build I would certainly appreciate it. That is one thing that is hard to find for cross reference.
Thank Everybody for all of your support!
Clyde
| - The Matronics Pulsar-List Email Forum - | | Use the List Feature Navigator to browse the many List utilities available such as the Email Subscriptions page, Archive Search & Download, 7-Day Browse, Chat, FAQ, Photoshare, and much more:
http://www.matronics.com/Navigator?Pulsar-List |
|
_________________ J.M. Oyler "Clyde" |
|